Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17451-17460 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993155 | Project ID: 993155 DEA: 061A2204 EFIS: 0619000208 COOP: 061714 | 06-KER-46-30.5 | Lost Hills Pedestrian Bridge | Lost Hills, California 93249 | 2 (07/21/2021) | Details CEM-3701 Report | |
993159 | Project ID: 993159 DEA: 08323034 EFIS: 0812000059 COOP: 081703 | 08-RIV-60-18.8/19.6 | Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configuration | SR-60 & Moreno Beach Interchange | 2 (07/27/2021) | Details CEM-3701 Report | |
993186 | Project ID: 993186 DEA: 04264704 EFIS: 0400000740 | 04-SCL-101-40.0/41.5 | Reconstruction of the existing three-quadrant cloverleaf interchange to a Type L-9 partial cloverleaf interchange | The Project limits are on Route US 101 at De La Cruz Blvd/Trimble Road Interchange in San Jose at Santa Clara County | 2 (08/09/2021) | Details CEM-3701 Report | |
993277 | Project ID: 993277 Permit Numbers: 0321AOP0525 | 03---0.4 | Modify ramps and install signal at SR-113 and Hutchison Drive interchange | Hutchison Drive, Davis | 2 (11/10/2021) | Details CEM-3701 Report | |
993304 | Project ID: 993304 DEA: 041Q2204 EFIS: 0418000220 COOP: 042833 | 04-ALA-262-R0.0/R1.07 | Mission Blvd Cross Connector | On State Route 262 (Mission Boulevard) Cross Connector from I-880 to I-680 in the City of Fremont w | 2 (05/09/2023) | Details CEM-3701 Report | |
993349 | Project ID: 993349 DEA: 031J6904 EFIS: 0321000047 COOP: 030733 | 03-YOL-113-R8.7 | Sports Park Drive Pedestrian Overcrossing | SR113/Sports Park Drive POC | 2 (10/20/2021) | Details CEM-3701 Report | |
993615 | Project ID: 993615 DEA: 022H8004 EFIS: 0217000010 COOP: 020184 | 02-SHA-5-R11.5/R12.8 | Bonnyview Interchange LCO | NB and SB Interstate 5 off-ramps at South Bonnyview Road | 2 (03/02/2022) | Details CEM-3701 Report | |
993393 | Project ID: 993393 DEA: 054611U4 EFIS: 0500000548 COOP: 050374 | 05-SB-217-1.5/2.5 | 2 (03/11/2024) | Details CEM-3701 Report | |||
993412 | Project ID: 993412 DEA: 081F7204 EFIS: 0815000030 | 08-RIV-15- | Street and Ramp Widening at I-15/Main Street Interchange Project | 07/27/2023 | 2 (11/15/2021) | Details CEM-3701 Report | |
993414 | Project ID: 993414 DEA: 081H1604 EFIS: 0816000168 COOP: 081705 | 08-SBD-10- | The I-10 Alabama Street Improvement Project includes widening Alabama Street in the northbound direction to accommodate a right turn pocket at the I-10 eastbound on-ramp | 2 (11/17/2021) | Details CEM-3701 Report |