Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17421-17430 of 17829 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211847 | Project ID: 211847 DEA: 07224104 EFIS: 0700000357 | 07-LA-60-21.5R/23.0R | Construct Interchange -MAINLINE PAVEMENT REPAIR, PCC SLABSC HM1 (RIGID) PROGRAM | CITY OF INDUSTRY & DIAMOND BAR FROM FAIRWAY DR UC TO OLD BREA CYN RD UC | 04/26/2018 | 2 (04/25/2017) | Details CEM-3701 Report |
209780 | Project ID: 209780 DEA: 043A7904 EFIS: 0400020061 COOP: 042482A1 | 04-SOL-80-23.1 | Install New Traffic Signal | At Intersection of Lagoon Valley Road and the Interstate Route 80 | 2 (08/19/2019) | Details CEM-3701 Report | |
209783 | Project ID: 209783 DEA: 043G9104 EFIS: 0413000110 COOP: 042414A1 | 04-ALA-80,84,92-var | 01/08/2025 | 2 (09/16/2019) | Details CEM-3701 Report | ||
209823 | Project ID: 209823 DEA: 044H6104 EFIS: 0413000216 COOP: 042551 | 04-CC-680-R16.6/23.7,R18.8/23.2 | Conversion of Interstate 680 (I-680) High Occupancy Vehicle (HOV) Lanes to Express Lanes, | In the southbound direction from south of Marina Vista Road to Treat Boulevard and in the northbound direction from State Route 242 to Marina Vista Road | 05/18/2021 | 2 (02/17/2015) | Details CEM-3701 Report |
209843 | Project ID: 209843 DEA: 04290824 COOP: 042167A2 | 04-ALA-580-R8.3/R21.4 | Westbound HOV Lane | From east of the Greenville Road Interchange in Livermore to the San Ramon Road/ Foothill Road Interchange in Dublin within the jurisdiction of ACCMA. | 01/07/2025 | 2 (09/16/2019) | Details CEM-3701 Report |
209899 | Project ID: 209899 DEA: 07242304 EFIS: 0700000419 COOP: 075002 | 07-LA-101-31.6/32.2 | Lost Hills Road Overcrossing Replacement and Interchange Modification | FROM 0.3 MILES SOUTH OF LOST HILLS ROAD OVERCROSSING TO 0.3 MILES NORTH OF LOST HILLS ROAD OVERCROSSING. | 08/13/2018 | 2 (08/04/2014) | Details CEM-3701 Report |
209900 | Project ID: 209900 DEA: 042620A4 EFIS: 0400000725 | 04-SCL-880-2.6/2.7 | Landscaping project which includes a three-year plant establishment period | Route 880 at Coleman Avenue Interchange | 01/07/2025 | 2 (08/22/2019) | Details CEM-3701 Report |
209901 | Project ID: 209901 DEA: 050H7304 EFIS: 0500000082 COOP: 050274 | 05-SLO-101-25.5 - 26.3 | Construct Los Osos Valley Road Overcrossing, Widen San Luis Obispo Creek Bridge, Improve South Higuera Street/LOVR intersection, and Improve pedestrian and bicycle access | Intersection of Los Osos Valley Road and US Highway 101 | 04/06/2016 | 2 (09/11/2014) | Details CEM-3701 Report |
209902 | Project ID: 209902 DEA: 041G7004 EFIS: 0400020169 Permit Numbers: 0414NMC0687 04146DP1506 | 04-SF-80-5.5/5.5 | This project will re-construction the WB I-80 Fremont off-Ramp by Creating a tee -intersection with Fremont st. and eliminating the the current free flowing Fremont Street dual left- turns at the end of the off-ramp. | Fremont St., San Francisco | 08/22/2018 | 2 (10/09/2014) | Details CEM-3701 Report |
209928 | Project ID: 209928 COOP: 042271,042248 Permit Numbers: 0414NMC0686 | 04-CC-4- | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |