Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15501-15510 of 16003 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
7451 | Project ID: 7451 EFIS: 0000001155 Permit Numbers: 0308NMC0223 | 03-PLA-65-6.5/7.4 | Reconstruct Interchange | Pleasant Grove Blvd, Roseville | 04/27/2018 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |
7452 | Project ID: 7452 EFIS: 0000001155 Permit Numbers: 05126SE0197 | 05-SCR-9-5.79/6.46 | Detour highway traffic onto local roads for Felton Remembers Parade on May 28, 2012 from 9:30 AM to 12 Noon | Highway 9, Felton | 09/18/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |
7454 | Project ID: 7454 EFIS: 0000001155 Permit Numbers: 08126DP0403 | 08-RIV-10-54.52/54.93 | Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street light | Monroe Street, Indio | 01/21/2013 | 2 (01/21/2013) | Details Personnel CEM-3701 Report |
7473 | Project ID: 7473 EFIS: 0000001155 Permit Numbers: 0312NSN0037 | 03-YOL-128-9.67/9.67 | Construction of new traffic signal with intersection widening and removal of free-right turn at I-505 SB off-ramp. The project also includes north side pedestrian improvements at the intersection, storm drainage, water and sewer improvements | Hwy 128 (Grant Ave), Winters | 04/27/2018 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |
7475 | Project ID: 7475 DEA: 04445604 EFIS: 0400001081 COOP: 042434 Permit Numbers: 0412NMC0872 0412NDP1643 | 04-SCL-280-5.1/5.2,0.0/0.8 | The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, widening | In San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing | 05/07/2019 | 2 (12/11/2012) | Details Personnel CEM-3701 Report |
7477 | Project ID: 7477 DEA: 071W0404 EFIS: 0700020905 MINOR: 07A3180 | 07-LA-60-11.5/20.1 | Plant Establishment | IN LOS ANGELES COUNTY AND IN THE CITY OF INDUSTRY ON ROUTE 60 FROM 0.2 MILES EAST OF THE 605/60 SEPARATION TO 0.2 MILES WEST OF NOGALES St ESTABLISH EXISTING PLANTING | 08/17/2021 | 2 (07/09/2021) | Details Personnel CEM-3701 Report |
7478 | Project ID: 7478 DEA: 04246584 | 04-CC-4- | State route 4 bypass in cities of Antioch and Brentwood from 0.5 N of lone tree way to 0.3 mile north of sand creek | 08/18/2022 | 2 (12/01/2012) | Details Personnel CEM-3701 Report | |
7479 | Project ID: 7479 DEA: 051C5804 EFIS: 0512000178 | 05--- | 08/27/2019 | NOT VERIFIED | Details Personnel CEM-3701 Report | ||
7507 | Project ID: 7507 DEA: 060M9604 EFIS: 0600020398 MINOR: 06A1763 | 06-TUL-190-11.41 | Install Flshing Beacons | Near Porterville at Intersection of Rte 190 and 208 | 10/16/2020 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |
7508 | Project ID: 7508 DEA: 060M9504 EFIS: 0600020397 MINOR: 06A1772 | 06-TUL-63-12.13 | Modify Signal and Lighting | Near Visalia at Intersection of Rte 63 and Ave 328 | 10/16/2020 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |