Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15751-15760 of 17993 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2283 | Project ID: 2283 DEA: 043S5204 | 04-MM-1-11.45/11.95 | Soldier Pile Wall with Tiebacks and road repairs use spec for 04-3s1704 | 06/08/2011 | 1 (04/27/2011) | Details CEM-3701 Report | |
2282 | Project ID: 2282 DEA: 043S4804 | 04-NAP-128-12.57 | REPAIR LANE AND SLIPOUT | 06/08/2011 | 1 (04/29/2011) | Details CEM-3701 Report | |
2281 | Project ID: 2281 DEA: 043S4704 EFIS: 0400000996 | 04-SON-1-29.8 | SIDESLOPE DAMAGE AND SLIPOUT; CONSTRUCT SOIL NAIL WALL | 06/08/2020 | 1 (10/29/2007) | Details CEM-3701 Report | |
2280 | Project ID: 2280 DEA: 043S4504 EFIS: 0400000995 | 04-CC-680-23.0 | SIDESLOPE DAMAGE AND SLIDE | 04/14/2021 | 1 (08/17/2006) | Details CEM-3701 Report | |
2279 | Project ID: 2279 DEA: 043S4404 | 04-SOL-505-0.2 | SLIPOUT | 06/08/2020 | 1 (08/15/2006) | Details CEM-3701 Report | |
2278 | Project ID: 2278 DEA: 043S4304 | 04-MRN-1-9.0 | REPAIR SHOULDER | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report | |
2277 | Project ID: 2277 DEA: 043S4204 | 04-SM-1-39.7/40.9 | RETAINING WALL @STEVE PIPE | 01/01/2011 | 1 (04/26/2011) | Details CEM-3701 Report | |
2276 | Project ID: 2276 DEA: 043S3004 EFIS: 0400000992 | 04-SON-128-1.28 | SLOPE REPAIR - RTE 128 TIE BACK SOLIDER PILE WALL | 08/20/2019 | 1 (12/13/2006) | Details CEM-3701 Report | |
2275 | Project ID: 2275 DEA: 043S2904 EFIS: 0400000991 | 04-SON-1-21.57 | SIDESLOPE DAMAGE ; SLIP OUT | 05/07/2019 | 1 (08/10/2006) | Details CEM-3701 Report | |
2274 | Project ID: 2274 DEA: 043S2804 | 04-MM-1-10.0 | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |