Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13661-13670 of 16969 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
3365 | Project ID: 3365 DEA: 060M5104 | 06-FRE,KER,TUL,INY,MNO-5,58,99,395-Var | PLACE HMA ON EXISTING PAVEMENT OR REPLACE EXISTING PAVEMENT WITH PCC. | FRESNO, KERN, TULARE, INYO, AND MONO COUNTIES AT VARIOUS LOCATIONS | 07/20/2012 | 1 (03/14/2011) | Details CEM-3701 Report |
3364 | Project ID: 3364 DEA: 060M5004 | 06-FRE-33,145,198-VAR | COLD PLANE AND RUBBERIZED HMA OVERLAY | FRESNO COUNTY AT VARIOUS LOCATIONS | 12/13/2012 | 1 (06/24/2011) | Details CEM-3701 Report |
3363 | Project ID: 3363 DEA: 060M4904 | 06-KIN,FRE-41,269-R46.1/R48.3,0.5/12.7 | POLYMER MODIFIED CHIP SEAL | KINGS AND FRESNO COUNTIES ON ROUTE 41 FROM 0.2 MILE SOUTH OF FLINT AVENUE TO EXCELSIOR AVENUE UNDERCROSSING AND ON ROUTE 269 FROM ROUTE 5 TO ROUTE 198 | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
3362 | Project ID: 3362 DEA: 060M4804 EFIS: 0600020026 | 06-FRE-41-R22.5/R31.7 | SEAL JOINTS EXISTING PCC PAVEMENT. | FRESNO COUNTY IN FRESNO FROM 3.0 MILES NORTH OF ROUTE 41/99 SEPARATION TO FRIANT ROAD UNDERCROSSING | 05/21/2020 | 1 (03/21/2011) | Details CEM-3701 Report |
3361 | Project ID: 3361 DEA: 060M4504 | 06-KER-33-68.8/73.7 | COLD IN PLACE RECYCLING AND PLACE HOT MIX ASPHALT SURFACING. | KERN COUNTY NEAR BLACKWELLS CORNER FROM 0.4 MILE SOUTH OF TWISSELMAN ROAD TO KINGS COUNTY LINE | 12/13/2012 | 1 (04/18/2011) | Details CEM-3701 Report |
3360 | Project ID: 3360 DEA: 060M4304 | 06-TUL-63-8.0/9.2;19.8/R30.0 | SLURRY SEAL ON EXISTING PAVEMENT. | TULARE COUNTY IN VISALIA FROM MINERAL KING AVENUE TO SWEET AVENUE AND IN AND NEAR CUTLER AND OROSI FROM 0.3 MILE SOUTH OF AVENUE 388 TO FRESNO COUNTY LINE | 12/13/2012 | 1 (03/28/2011) | Details CEM-3701 Report |
3359 | Project ID: 3359 DEA: 060M4004 | 06-KER-5703- | CONSTRUCT NEW OFFICE BUILDING. | KERN COUNTY AT BODFISH AT THE BODFISH MAINTENANCE STATION AT 3115 KERN RIVER CANYON ROAD | 08/24/2012 | 1 (10/10/2011) | Details CEM-3701 Report |
3358 | Project ID: 3358 DEA: 060M3504 EFIS: 0600000957 MINOR: 06A1692 | 06-KIN-43-7.9/17.4 | Remove and Replace Fence | IN KINGS COUNTY NEAR HANFORD FROM CROSS CREEK TO HANFORD-ARMONA ROAD | 07/28/2020 | 2 (12/05/2014) | Details CEM-3701 Report |
3357 | Project ID: 3357 DEA: 060M3204 | 06-KER-178-R30.5/R41.6 | REPAIR CULVERT WITH CURED IN PLACE PIPELINE OR CONCRETE INVERT PAVING. | KERN COUNTY NEAR LAKE ISABELLA AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF KERN CANYON ROAD TO BODFISH UNDERCROSSING | 12/13/2012 | 1 (03/28/2011) | Details CEM-3701 Report |
3356 | Project ID: 3356 DEA: 060M3004 | 06-KER-178-15.8/26.5 | REPAIR EXISTING CULVERTS BY CURED IN PLACE PIPELINER. | KERN COUNTY NEAR BAKERSFIELD AT VARIOUS LOCATIONS FROM 2.0 MILES EAST OF SIDEHILL VIADUCT TO 0.1 MILE WEST OF DEMOCRAT SPRINGS ROAD | 12/13/2012 | 1 (04/04/2011) | Details CEM-3701 Report |