Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13661-13670 of 16969 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
3365Project ID: 3365
DEA: 060M5104
06-FRE,KER,TUL,INY,MNO-5,58,99,395-VarPLACE HMA ON EXISTING PAVEMENT OR REPLACE EXISTING PAVEMENT WITH PCC.FRESNO, KERN, TULARE, INYO, AND MONO COUNTIES AT VARIOUS LOCATIONS07/20/20121 (03/14/2011)Details CEM-3701 Report
3364Project ID: 3364
DEA: 060M5004
06-FRE-33,145,198-VARCOLD PLANE AND RUBBERIZED HMA OVERLAYFRESNO COUNTY AT VARIOUS LOCATIONS12/13/20121 (06/24/2011)Details CEM-3701 Report
3363Project ID: 3363
DEA: 060M4904
06-KIN,FRE-41,269-R46.1/R48.3,0.5/12.7POLYMER MODIFIED CHIP SEALKINGS AND FRESNO COUNTIES ON ROUTE 41 FROM 0.2 MILE SOUTH OF FLINT AVENUE TO EXCELSIOR AVENUE UNDERCROSSING AND ON ROUTE 269 FROM ROUTE 5 TO ROUTE 19811/04/20111 (11/04/2011)Details CEM-3701 Report
3362Project ID: 3362
DEA: 060M4804
EFIS: 0600020026
06-FRE-41-R22.5/R31.7SEAL JOINTS EXISTING PCC PAVEMENT.FRESNO COUNTY IN FRESNO FROM 3.0 MILES NORTH OF ROUTE 41/99 SEPARATION TO FRIANT ROAD UNDERCROSSING05/21/20201 (03/21/2011)Details CEM-3701 Report
3361Project ID: 3361
DEA: 060M4504
06-KER-33-68.8/73.7COLD IN PLACE RECYCLING AND PLACE HOT MIX ASPHALT SURFACING.KERN COUNTY NEAR BLACKWELLS CORNER FROM 0.4 MILE SOUTH OF TWISSELMAN ROAD TO KINGS COUNTY LINE12/13/20121 (04/18/2011)Details CEM-3701 Report
3360Project ID: 3360
DEA: 060M4304
06-TUL-63-8.0/9.2;19.8/R30.0SLURRY SEAL ON EXISTING PAVEMENT.TULARE COUNTY IN VISALIA FROM MINERAL KING AVENUE TO SWEET AVENUE AND IN AND NEAR CUTLER AND OROSI FROM 0.3 MILE SOUTH OF AVENUE 388 TO FRESNO COUNTY LINE12/13/20121 (03/28/2011)Details CEM-3701 Report
3359Project ID: 3359
DEA: 060M4004
06-KER-5703-CONSTRUCT NEW OFFICE BUILDING.KERN COUNTY AT BODFISH AT THE BODFISH MAINTENANCE STATION AT 3115 KERN RIVER CANYON ROAD08/24/20121 (10/10/2011)Details CEM-3701 Report
3358Project ID: 3358
DEA: 060M3504
EFIS: 0600000957
MINOR: 06A1692
06-KIN-43-7.9/17.4Remove and Replace FenceIN KINGS COUNTY NEAR HANFORD FROM CROSS CREEK TO HANFORD-ARMONA ROAD07/28/20202 (12/05/2014)Details CEM-3701 Report
3357Project ID: 3357
DEA: 060M3204
06-KER-178-R30.5/R41.6REPAIR CULVERT WITH CURED IN PLACE PIPELINE OR CONCRETE INVERT PAVING.KERN COUNTY NEAR LAKE ISABELLA AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF KERN CANYON ROAD TO BODFISH UNDERCROSSING12/13/20121 (03/28/2011)Details CEM-3701 Report
3356Project ID: 3356
DEA: 060M3004
06-KER-178-15.8/26.5REPAIR EXISTING CULVERTS BY CURED IN PLACE PIPELINER.KERN COUNTY NEAR BAKERSFIELD AT VARIOUS LOCATIONS FROM 2.0 MILES EAST OF SIDEHILL VIADUCT TO 0.1 MILE WEST OF DEMOCRAT SPRINGS ROAD12/13/20121 (04/04/2011)Details CEM-3701 Report