Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13321-13330 of 17257 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
4003 | Project ID: 4003 DEA: 072395U4 | 07-LA-110-25.8/31.9 | CONSTRUCT CONCRETE BARRIER IN MEDIAN AND OUTSIDE SHOULDER AREAS | In LA, Pasadena, and South Pasadena from the 5/110 desperation to Glenarm St. | 07/18/2012 | 1 (07/18/2012) | Details CEM-3701 Report |
4002 | Project ID: 4002 DEA: 07239504 | 07-LA-110-025.9/031.9 | UPGRADE MEDIAN BARRIER | 1 (07/11/2007) | Details CEM-3701 Report | ||
4001 | Project ID: 4001 DEA: 07237204 | 07-VEN-126- | INSTALL THRIE BEAM BARRIER | IN VENTURA COUNTY IN VENTURA ANDSANTA PAULA FROM ROUTE 101 AND 126SEPARATION TO TODD BARRANCA BRIDGEAND FROM PECK ROAD OVERCROSSING TO HALLOCK DRIVE | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
4000 | Project ID: 4000 DEA: 07235904 | 07-LA-5-006.8/018.4 | CONST LITTR REMVL DEV PHASE 4 OF 10 | 06/20/2011 | 1 (02/18/2009) | Details CEM-3701 Report | |
3999 | Project ID: 3999 DEA: 07235504 | 07-LA-5-63.5/68.5 | CONSTRUCT SOUNDWALLS AND WIDEN STRUCTURES WITH CIP RCB GIRDER | 09/30/2011 | 1 (01/06/2012) | Details CEM-3701 Report | |
3998 | Project ID: 3998 DEA: 07234904 | 07-LA-710- 6.8 | HIGHWAY PLANTING AND IRRIGATION | IN LOS ANGELES COUNTY IN LONG BEACH FROM ROUTE 1 PACIFIC COAST HIGHWAYTO WARDLOW AVENUE | 08/26/2010 | 1 (08/26/2010) | Details CEM-3701 Report |
3997 | Project ID: 3997 DEA: 07234204 | 07-VEN-101- 22.0/ 23.7 | LANDSCAPE MITIGATION | 08/22/2012 | 1 (08/22/2012) | Details CEM-3701 Report | |
3996 | Project ID: 3996 DEA: 07233904 EFIS: 0700000393 | 07-LA-405-10.8/11.4 | Avalon Blvd Interchange Modification at I-405 Freeway Project (Permit #710-NMC-0930) | In Carson from 213th Street Undercrossing to Torrance Lateral Channel | 09/07/2018 | 1 (09/07/2018) | Details CEM-3701 Report |
3995 | Project ID: 3995 DEA: 072332A4 EFIS: 0700000390 | 07-LA-5-R46.3/R50.0 | WIDEN ROADWAY AND BRIDGES WITH PCC AND CONSTRUCT RETAINING WALLS. | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM 0.3 MILE SOUTH OF WELDON CANYON OVERCROSSING TO 0.4 MILE SOUTH OF PICO CANYON ROAD/LYONS AVENUE OVERCROSSING | 06/02/2015 | 1 (04/23/2012) | Details CEM-3701 Report |
3994 | Project ID: 3994 DEA: 07232604 | 07-LA-5,10,60-15.9 | ROADSIDE ACCESS IMPROVEMENTS | IN LOS ANGELES COUNTY IN LOSANGELES AND MONTEREY PARK ATVARIOUS LOCATIONS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |