Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15291-15300 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993806 | Project ID: 993806 DEA: 07330504 EFIS: 0716000214 | 07-LA-710-R15.1/21.9 | INSTALL HIGHWAY PLANTING AND PLACE MINOR CONCRETE. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE NORTH OF ROSECRANS AVENUE TO 0.1 MILE SOUTH OF ATLANTIC AVENUE UNDERCROSSING | 09/24/2024 | 1 (05/11/2022) | Details CEM-3701 Report |
993807 | Project ID: 993807 DEA: 07353304 EFIS: 0718000272 | 07-LA-110-23.1 | REPLACE BRIDGE RAILING WITH CONCRETE BARRIER. AND UPGRADE LIGHTING. | LOS ANGELES COUNTY IN LOS ANGELES AT THIRD STREET OVERCROSSING | 09/24/2024 | 1 (05/11/2022) | Details CEM-3701 Report |
993808 | Project ID: 993808 DEA: 074V2404 EFIS: 0720000227 | 07-LA-5,10,60,605-Var | PREPARE AND STAIN CONCRETE. | LOS ANGELES COUNTY IN LOS ANGELES AND BALDWIN PARK AT VARIOUS LOCATIONS | 03/08/2023 | 1 (05/11/2022) | Details CEM-3701 Report |
993809 | Project ID: 993809 DEA: 074V3004 EFIS: 0721000091 | 07-LA-5-8.2 | UPGRADE TRAFFIC SIGNAL AND LIGHTING. | LOS ANGELES COUNTY IN DOWNEY AT ROUTE 5/19 SEPARATION | 1 (05/11/2022) | Details CEM-3701 Report | |
993810 | Project ID: 993810 DEA: 074W5204 EFIS: 0718000366 | 07-LA-105-R2.5/R17.9 | REPLACE JOINT SEALS AND APPLY BRIDGE DECK TREATMENT MATERIAL. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM WESTBOUND ROUTE 105-NORTHBOUND AND SOUTHBOUND ROUTE 405 CONNECTOR OVERCROSSING TO HOXIE AVENUE OVERCROSSING | 08/01/2023 | 1 (05/11/2022) | Details CEM-3701 Report |
993811 | Project ID: 993811 DEA: 11422304 EFIS: 1115000180 | 11-SD-78-0.3/R16.0 | CULVERT REPAIRS, COLD PLANE, RHMA-G, MODIFY LANDSCAPE AND ELECTRICAL. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF ROUTE 78/5 SEPARATION TO 0.5 MILE WEST OF ROUTE 15/78 SEPARATION | 1 (06/13/2022) | Details CEM-3701 Report | |
993812 | Project ID: 993812 DEA: 11431274 | 11-SD-5-R0.3/R36.0 | CMGC Project- Restore the pavement to a state of good repair through roadway rehabilitation, pavement preservation, drainage restoration, transportation management system upgrades, and American with Disabilities Act (ADA) infrastructure improvements. | SD County | 1 (09/19/2022) | Details CEM-3701 Report | |
993813 | Project ID: 993813 DEA: 01401104 EFIS: 0100000154 | 01-MEN-1-43.3/44.2 | Replace or rehabilitate the Albion River Bridge with a structure that will ensure the safety and reliability on State Route 1. | Albion River Bridge | 1 (05/16/2022) | Details CEM-3701 Report | |
993814 | Project ID: 993814 DEA: 100X4604 | 10-SJ-5-26.1/26.6 | CMGC Project-Replace or rehabilitate the Stockton Channel Viaduct to increase serviceability and permitted load capability. | Stockton Channel Viaduct | 1 (09/15/2022) | Details CEM-3701 Report | |
993815 | Project ID: 993815 DEA: 081C0814 EFIS: 0816000086 | 08-RIV-10-R60.7/R74.3 | I-10 PAVEMENT REHABILITATION (SEGMENT 1) PROJECT | Coachella | 1 (05/03/2022) | Details CEM-3701 Report |