Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14381-14390 of 17775 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215602 | Project ID: 215602 DEA: 031G9904 EFIS: 0320000140 | 03-YOL-16-15.4/19.8 | REPLACE CULVERTS & INSTALL CURED-IN-PLACE PIPELINERS. | YOLO COUNTY NEAR GUINDA AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF COUNTY ROAD 68 TO 0.3 MILE EAST OF CACHE CREEK CASINO | 06/27/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
215603 | Project ID: 215603 DEA: 032G1004 | 03-ED-49-9.6/14.2 | COLD PLANE AC PAVEMENT AND HMA OVERLAY. | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM PLEASANT VALLEY ROAD TO 0.2 MILE SOUTH OF GILMORE STREET | 03/02/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
215604 | Project ID: 215604 DEA: 032G1704 EFIS: 0320000236 | 03-YOL-113-R10.2/R11.1 | Slab Replacement | In Yolo County on route 113 In Woodland From East Woodland Overhead To 0.4 Mile West of Route 113/5 Separation | 11/30/2021 | 1 (07/06/2021) | Details CEM-3701 Report |
215605 | Project ID: 215605 DEA: 040W3904 EFIS: 0420000212 | 04-CC-160-L1.1/0.6 | COLD PLANE AC PAVEMENT AND PLACE HMA (A). | CONTRA COSTA COUNTY IN ANTIOCH FROM 0.2 MILE SOUTH OF MAIN STREET TO 0.1 MILE NORTH OF WILBUR AVENUE | 06/29/2023 | 1 (04/12/2021) | Details CEM-3701 Report |
215606 | Project ID: 215606 DEA: 061C0014 EFIS: 0620000167 | 06-MAD-145-8.6 | PARKING LOT RESURFACING WITH COLD PLANE AND HOT MIX ASPHALT. | MADERA COUNTY IN MADERA AT THE MADERA MAINTENANCE STATION AT 125 WEST ALMOND AVENUE | 03/02/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
215607 | Project ID: 215607 DEA: 061C6504 EFIS: 0621000099 | 06-FRE-41-R0.5/M5.9 | RESURFACE AC PAVEMENT AND INSTALL MEDIAN TYPE K CONCRETE BARRIER. | FRESNO COUNTY ABOUT 6 MILES NORTH OF LEMOORE FROM 0.5 MILE NORTH OF EXCELSIOR AVENUE UNDERCROSSING TO 0.2 MILE SOUTH OF ELKHORN AVENUE | 05/04/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
215608 | Project ID: 215608 DEA: 074V0304 EFIS: 0718000267 | 07-LA-90-1.8 | INSTALL SIGNAL AND LIGHTING. | LOS ANGELES COUNTY IN LOS ANGELES AT ROUTE 90 ON/OFF RAMP CULVER BOULEVARD | 1 (07/12/2021) | Details CEM-3701 Report | |
215609 | Project ID: 215609 DEA: 074W9404 EFIS: 0720000196 | 07-LA-101-0.0/1.0 | COLD PLANE AND OVERLAY WITH RUBBERIZED HOT MIX ASPHALT, SLURRY SEAL. | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 10/101 SEPARATION TO SPRING STREET OVERCROSSING | 07/14/2022 | 1 (08/17/2021) | Details CEM-3701 Report |
215610 | Project ID: 215610 DEA: 081J4904 EFIS: 0818000057 | 08-SBD-5707- | BUILDING CONSTRUCTION IN MAINTENANCE STATION. | AT THE CAJON MAINTENANCE STATION AT 14757 STATE HIGHWAY 138 | 10/13/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
215611 | Project ID: 215611 DEA: 081L6604 EFIS: 0820000134 | 08--- | 04/08/2022 | 1 (04/08/2022) | Details CEM-3701 Report |