Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 51-60 of 17275 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214800Project ID: 214800
DEA: 031G5204
EFIS: 0318000314
03-YOL-505-10.0/21.7INSTALL EPDM RUBBER PIPE JOINT SEALS & REPLACE CULVERTS.YOLO COUNTY NEAR MADISON AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF SOUTH FORK WILLOW SLOUGH BRIDGE TO 0.7 MILE SOUTH OF ROUTE 505/5 SEPARATION03/16/20211 (03/24/2020)Details CEM-3701 Report
215405Project ID: 215405
DEA: 032G1604
EFIS: 0320000235
03-YOL-45-0.6/12.9COLD PLANE AC PAVEMENT AND REPLACE WITH HOT MIX ASPHALT.YOLO COUNTY NEAR KNIGHTS LANDING FROM SYCAMORE SLOUGH BRIDGE TO YOLO COUNTY LINE ROAD06/30/20211 (01/18/2021)Details CEM-3701 Report
1000142Project ID: 1000142
DEA: 033G0604
EFIS: 0323000120
03-YOL-45-0.2/12.9COLD PLANE AC PAVEMENT, HMA AND SEAL COAT.YOLO COUNTY NEAR KNIGHTS LANDING FROM SYCAMORE SLOUGH BRIDGE TO COUNTY LINE ROAD 1 (04/17/2024)Details CEM-3701 Report
1000205Project ID: 1000205
DEA: 033G1204
EFIS: 0323000169
03-YOL-16-10.3/13.5INSTALL REINFORCED CONCRETE PIPE AND CURED-IN-PLACE PIPELINERS.YOLO COUNTY NEAR GUINDA AT VARIOUS LOCATIONS FROM ROAD 44 TO ROAD 61 NOT VERIFIEDDetails CEM-3701 Report
215602Project ID: 215602
DEA: 031G9904
EFIS: 0320000140
03-YOL-16-15.4/19.8REPLACE CULVERTS & INSTALL CURED-IN-PLACE PIPELINERS.YOLO COUNTY NEAR GUINDA AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF COUNTY ROAD 68 TO 0.3 MILE EAST OF CACHE CREEK CASINO06/27/20221 (03/29/2021)Details CEM-3701 Report
213182Project ID: 213182
DEA: 030C4724
EFIS: 0314000272
03-YOL-16-20.5/21.3, 28.2/31.8ADD TURN LANES & ROUNDABOUT, ALIGN CURVE, WIDEN SHOULDER, CULVERT WORKYOLO COUNTY NEAR ESPARTO FROM 0.3 MILE WEST TO 0.4 MILE EAST OF COUNTY ROAD 79 AND FROM 0.1 MILE EAST OF PLAINFIELD STREET TO 0.1 MILE EAST OF COUNTY ROAD 9010/06/20211 (07/26/2018)Details CEM-3701 Report
865Project ID: 865
DEA: 030F6204
03-YOL-5-R24.6,R26.4REPLACE PLASTIC LINERS IN SEWER PONDS AND INSTALL SEWER LINEYOLO COUNTY NEAR DUNNIGAN AT 1.0 MILE SOUTH OF COUNTY ROAD 6 OVERCROSSING AND AT DUNNIGAN SAFETY ROADSIDE REST AREA01/24/20121 (01/24/2012)Details CEM-3701 Report
213847Project ID: 213847
DEA: 034H2804
EFIS: 0318000239
MINOR: 03A2859
03-YOL-80-5.6INSTALL RAMP METERYOLO COUNTY NEAR DAVIS AT CHILES ROAD ON-RAMP TO EASTBOUND ROUTE 80.09/15/20221 (01/08/2019)Details CEM-3701 Report
211228Project ID: 211228
DEA: 030C4714
EFIS: 0314000271
03-YOL-16-23.2/23.5STRAIGHTEN HORIZONTAL CURVE, WIDEN SHOULDERS, INSTALL RUMBLE STRIPSYOLO COUNTY NEAR CAPAY FROM 0.3 MILE WEST OF COUNTY ROAD 82B TO COUNTY ROAD 82B12/13/20161 (08/23/2016)Details CEM-3701 Report
1278Project ID: 1278
DEA: 034C7404
03-YOL-113-10.7/10.9RECONSTRUCT EMBANKMENT SLOPE, HMA, MBGR, AND CONCRETE PAVEMENTYolo County in Woodland from 0.2 mile to 0.4 mile North of Route 5/113 Separation.12/29/20091 (12/29/2009)Details CEM-3701 Report