Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14471-14480 of 16952 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
6769 | Project ID: 6769 DEA: 120K6004 | 12-ORA-91,142-14.2/18.0,2.8/6.3 | REPLACED DAMAGED SIGN POST AND MBGR, TRAFFIC EQUIPMENT | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
6770 | Project ID: 6770 DEA: 120K6104 | 12-ORA-91,142-14.2/18.0,2.8/6.3 | INSTALL FIBER ROLLS | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
6778 | Project ID: 6778 DEA: 120K7304 EFIS: 1200000371 MINOR: 12A1269 | 12-ORA-405-7.4 | Modify Changeable Message Sign System | 2 (03/22/2018) | Details CEM-3701 Report | ||
6779 | Project ID: 6779 DEA: 120K7904 MINOR: 12A1272 | 12-ORA-1-12.8/13.3 | EXTEND PLANT ESTABLISHMENT WORK | 06/20/2012 | NOT VERIFIED | Details CEM-3701 Report | |
6799 | Project ID: 6799 DEA: 120L4804 | 12-ORA-74-6.0/7.0 | ADD CULVERT DRAINAGE FACILITIES | 08/05/2010 | 1 (08/05/2010) | Details CEM-3701 Report | |
6804 | Project ID: 6804 DEA: 120L5704 | 12-ORA-73-16.02 | REPAIR AND REMOVE DRAIANGE PIPE AND REPAIR SINKHOLE | 08/05/2010 | 1 (08/05/2010) | Details CEM-3701 Report | |
6805 | Project ID: 6805 DEA: 120L5804 EFIS: 1200020009 MINOR: 12A1354 | 12-ORA-5-6.8 | RESURFACE THE RAMP WITH HOT MIX ASPHALT (OPEN GRADED) AND DRAINAGE IMPROVEMENT | 09/30/2013 | NOT VERIFIED | Details CEM-3701 Report | |
6808 | Project ID: 6808 DEA: 120L9404 EFIS: 1200020245 | 12-ORA-133-.65/4.2 | Rebuild basin embankment | 09/09/2016 | 1 (01/26/2011) | Details CEM-3701 Report | |
6812 | Project ID: 6812 DEA: 120M1804 EFIS: 1200020305 | 12-ORA-241-36.3 | 09/09/2016 | 1 (06/30/2011) | Details CEM-3701 Report | ||
6815 | Project ID: 6815 EFIS: 0000001155 Permit Numbers: 12106MC0496 | 12-ORA-1-4.91/4.91 | widen the Vista del Sol entrance at PCH. Work will include removal and replacement of the eastern curb return; removal and replacement concrete curb, pavement, & cross-gutter; removal and replacement of asphalt pavement; relocation of 2 traffic signal | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |