Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14441-14450 of 14772 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214668Project ID: 214668
DEA: 071XK904
EFIS: 0719000167
07-VEN-33-VEN-33 Remove & dispose of dirt off the site, repair the ero 02/07/20201 (02/07/2020)Details
Personnel
214670Project ID: 214670
DEA: 07331004
EFIS: 0716000220
07-VEN-101-CONCRETE SLAB REPLACEMENT & GRIND, PAVEMENT & RESURFACE ACE  1 (07/12/2021)Details
Personnel
214673Project ID: 214673
DEA: 101F8404
EFIS: 1017000010
MINOR: 10A2133
10-TUO-120-32.0/32.5   1 (03/24/2020)Details
Personnel
214680Project ID: 214680
DEA: 030F2854
EFIS: 0319000205
03-SAC-99-7.1/9.4Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment 10/30/20201 (03/02/2020)Details
Personnel
214679Project ID: 214679
DEA: 08448434
EFIS: 0816000080
08-RIV-91-18.4/20.7RETAINING WALL AT PACHAPPA - UP RAILROAD TIE-IN  1 (02/05/2020)Details
Personnel
214683Project ID: 214683
DEA: 010J6904
EFIS: 0119000078
01-LAK-29-47.34Repair Culvert 01/04/20211 (06/17/2020)Details
Personnel
214697Project ID: 214697
DEA: 07307104
EFIS: 0714000213
07-LA-101-32.8   1 (07/12/2021)Details
Personnel
214698Project ID: 214698
DEA: 120N8904
EFIS: 1214000130
12---   1 (02/22/2021)Details
Personnel
214701Project ID: 214701
DEA: 030F2844
EFIS: 0319000204
03-SAC-99-7.1/9.4Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments  1 (04/20/2020)Details
Personnel
214704Project ID: 214704
DEA: 04013594
EFIS: 0420000122
04-SF-80-7.8/8.3BATA Rehab  1 (02/12/2020)Details
Personnel