Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 121-130 of 18128 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213473 | Project ID: 213473 Permit Numbers: 0717NMC0725 07176DP2028 0717NRW2377 07186RT0795 | 07--105-9.788/9.788 | Addition of a pedestrian crosswalk on south side of the intersection to accommodate the proposed pedestrian crosswalk. Signal modifications, activated push button installation, curb return, sidewalk and curb ramp modifications. Existing median will be adjusted to accommodate the proposed crosswal | Willowbrook Ave east, NA | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report |
210975 | Project ID: 210975 Permit Numbers: 04156DP2177 0414NMC0989 | 04-SF-114-5.15/5.32 | Proposed improvements include reconstruction of Willow Road and Newbridge Street intersection,roadway widening for an additional westbound through/right-turn lane,curb reconstruction,utility relocations,traffic signal modifications,and signing and striping improvements. | Willow Road, Menlo Park | 08/22/2018 | 1 (10/27/2015) | Details CEM-3701 Report |
210703 | Project ID: 210703 Permit Numbers: 04156DP1438 0414NMC1139 0415NRT1459 | 04-SM--27.65/27.65 | Improvements include roadway widening to include an additional eastbound right turn lane,new sidewalk and a Class 1 Bike Path along Willow Rd between the existing railroad tracks and the existing Bay Trail located near Bayfront Expwy. | Willow Road / Bayfront Exp., Menlo Park | 09/14/2018 | 1 (07/29/2015) | Details CEM-3701 Report |
215141 | Project ID: 215141 DEA: 010G7104 EFIS: 0117000052 MINOR: 01A2003 | 01-HUM-96-0.6 | Willow Creek Charging Station | Willow Creek Maintenance Yard | 08/25/2022 | 1 (08/28/2020) | Details CEM-3701 Report |
7619 | Project ID: 7619 DEA: 041F9504 EFIS: 0412000586 | 04-CC-80-10.6/13.6 | Replace PCC slabs (eastbound | Willow Avenue to Carquinez Bridge, Hercules | 04/19/2021 | 1 (08/02/2012) | Details CEM-3701 Report |
211102 | Project ID: 211102 DEA: 010A4904 | 01-HUM-299-R25.0/R25.9 | WIDEN ROADWAY, CONSTRUCT HMA AND RHMA OVERLAY, DRAINAGE AND MGS | WIDEN ROADWAY, CONSTRUCT HMA AND RHMA OVERLAY, DRAINAGE AND MGS | 06/27/2017 | 1 (09/27/2016) | Details CEM-3701 Report |
210862 | Project ID: 210862 DEA: 031F4004 EFIS: 0300020420 | 03-PLA-80-35.1/38.3 | WIDEN EASTBOUND ROADWAY | WIDEN EASTBOUND ROADWAY | 06/19/2020 | 1 (10/20/2015) | Details CEM-3701 Report |
3688 | Project ID: 3688 EFIS: 0000001155 Permit Numbers: 0709NSN0432 | 07-LA-72-3.65/3.65 | Modify intersection by removing the split phasing for the NB and SB directions. Upgrade signal poles for NB, SB and EB left turn directions. Install front and advance detection for the NB and SB directions. Install pedestrian heads and pushbuttons. Modify | Whittier Blvd, Whittier | 11/08/2012 | NOT VERIFIED | Details CEM-3701 Report |
210491 | Project ID: 210491 Permit Numbers: 12156DP0120 1211NMC0297 1214NRT0731 | 12-ORA-VAR--1/-1 | Perform the work authorized under Caltrans Encroachment Permit No. 1211-NMC-0297 issued to the CITY OF LA HABRA in accordance with all the terms and conditions of the original permit. Permittee shall keep complete copies of both permits on the job site at all times while work is in progress. Thi | Whittier blvd ( SR 72, SR 39), la habra | 12/15/2015 | 1 (05/19/2015) | Details CEM-3701 Report |
209713 | Project ID: 209713 DEA: 032C5904 EFIS: 0300000304 Permit Numbers: 0314AOP0430 0314NRD0542 | 03-PLA-65-10.1/11.2 | Whitney Ranch Parkway Interchange | Whitney Ranch Parkway, Rocklin | 08/30/2018 | 1 (02/25/2014) | Details CEM-3701 Report |