Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17711-17720 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213782 | Project ID: 213782 DEA: 033F1404 EFIS: 0312000072 | 03-YOL-5-R6.5/R17.6 | PLACE PCC (CURB, SIDEWALK AND CURB RAMP) AND MODIFY ELECTRICAL SYSTEM | YOLO COUNTY NEAR WOODLAND AT VARIOUS LOCATIONS FROM 1.0 MILE NORTH OF COUNTY ROAD 102 OVERCROSSING TO 1.6 MILE SOUTH OF COUNTY ROAD 12 OVERCROSSING | 08/06/2019 | 1 (01/08/2019) | Details CEM-3701 Report |
993643 | Project ID: 993643 DEA: 032G4804 EFIS: 0321000217 | 03-YOL-113-11.3/16.2 | REPLACE CULVERTS & INSTALL CURED-IN-PLACE PIPELINERS. | YOLO COUNTY NEAR WOODLAND FROM ON/OFF-RAMP SOUTHBOUND 5 TO 0.5 MILE NORTH OF COUNTY ROAD 16 | 11/22/2022 | 1 (03/17/2022) | Details CEM-3701 Report |
213000 | Project ID: 213000 DEA: 030H2704 EFIS: 0315000119 | 03-YOL-5,113-VAR | MODIFY SIGNAL CONTROLLERS AND INSTALL INTERCONNECT CABLE | YOLO COUNTY ON EAST MAIN STREET FROM YOLO 113 TO YOLO 5 | 12/04/2019 | 1 (01/08/2019) | Details CEM-3701 Report |
1125 | Project ID: 1125 DEA: 033E0704 | 03-YOL-5-0.8/2.5 | REMOVE AC, PLACE HMA AND POLYESTER CONCRETE, AND INSTALL JOINT SEALS. | YOLO COUNTY ON ROUTE 5 FROM 0.8 MILE WEST OF SACRAMENTO/YOLO COUNTY LINETO 5.8 MILES EAST OF ROUTE 5/113 SEPARATION | 04/20/2012 | 1 (11/01/2010) | Details CEM-3701 Report |
7222 | Project ID: 7222 DEA: 034M3804 | 03-YOL-50,80-0.0/2.6,8.9/R11.3 | REPLACE PAVEMENT DELINEATION | YOLO COUNTY ON ROUTE 50 FROM THE ROUTE 50/80 CONNECTOR SEPARATION TO THE SACRAMENTO RIVER VIADUCT AND ON ROUTE 80 FROM 0.3 MILE WEST OF ENTERPRISE BOULEVARD TO THE SACRAMENTO RIVER BRYTE BEND BRIDGE | 01/04/2013 | 1 (05/07/2012) | Details CEM-3701 Report |
1236 | Project ID: 1236 DEA: 033M7404 | 03-YOL,PLA-80,65-Various | PLACE OVERLAYS ON BRIDGE DECKS | YOLO COUNTY ON ROUTE 80 AT VARIOUS LOCATIONS AND IN PLACER COUNTY ON ROUTE 65 AT HARDING BOULEVARD OVERCROSSING | 11/28/2012 | 1 (11/28/2012) | Details CEM-3701 Report |
213026 | Project ID: 213026 DEA: 031G1304 | 03-PLA,SAC,YOL-80-var | REPLACE STRIPING | YOLO, SACRAMENTO, AND PLACER COUNTIES FROM SOLANO COUNTY LINE TO 0.2 MILE EAST OF ROUTE 80/174 SEPARATION | 01/08/2019 | NOT VERIFIED | Details CEM-3701 Report |
5530 | Project ID: 5530 EFIS: 0000001155 Permit Numbers: 1008NSN0162 | 10-STA-132-27.68/27.68 | Widen State Highway 132 to accommodate the eastbound/westbound lanes at the intersection of Western Avenue for the installation of the signal light. Work will also include signing, striping, curb, gutter, sidewalk, handicap ramps, drain inlets, property d | Yosemite Blvd., Waterford | 02/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
215744 | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD | 1 (05/20/2021) | Details CEM-3701 Report | |
213152 | Project ID: 213152 DEA: 032F5904 EFIS: 0300020624 | 03-YUB,NEV-20-20.1/21.7, 0.0/0.1 | CURVE REALIGNMENT AND SHOULDER WIDENING | YUBA AND NEVADA COUNTIES NEAR SMARTSVILLE FROM 0.5 MILE WEST OF MCGANNEY LANE TO MOONEY FLAT ROAD | 12/06/2021 | 1 (04/24/2018) | Details CEM-3701 Report |