Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17701-17710 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214800 | Project ID: 214800 DEA: 031G5204 EFIS: 0318000314 | 03-YOL-505-10.0/21.7 | INSTALL EPDM RUBBER PIPE JOINT SEALS & REPLACE CULVERTS. | YOLO COUNTY NEAR MADISON AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF SOUTH FORK WILLOW SLOUGH BRIDGE TO 0.7 MILE SOUTH OF ROUTE 505/5 SEPARATION | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
1201 | Project ID: 1201 DEA: 033M3104 | 03-YOL-505-3.4/17.5 | Overlay Bridge Decks with Methacrylate and Polyester. | YOLO COUNTY NEAR MADISON AT VARIOUS LOCATIONS FROM CHICKAHMNY SLOUGH BRIDGE TO COUNTY ROAD 14 OVERCROSSING | 06/16/2011 | 1 (04/19/2010) | Details CEM-3701 Report |
214348 | Project ID: 214348 DEA: 033H4604 EFIS: 0318000002 | 03-YOL-16-3.9/4.2 | INSTALL CABLE NET DRAPERY SYSTEM. | YOLO COUNTY NEAR RUMSEY AT 0.1 MILE EAST OF CACHE CREEK BRIDGE | 10/06/2021 | 1 (09/16/2019) | Details CEM-3701 Report |
214762 | Project ID: 214762 DEA: 031G6104 EFIS: 0319000055 | 03-YOL-16-0.6/15.0 | REPLACE CULVERTS, HEADWALLS AND INSTALL CONCRETE INVERT PAVING. | YOLO COUNTY NEAR RUMSEY AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF COLUSA COUNTY LINE TO 0.1 MILE NORTH OF COUNTY ROAD 68 | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
210298 | Project ID: 210298 DEA: 030G1404 EFIS: 0314000080 | 03-YOL-16-0.0/18.9 | POLYMER ASPHALTIC EMULSION CHIP SEAL | YOLO COUNTY NEAR RUMSEY FROM COLUSA COUNTY LINE TO 0.2 MILE EAST OF ROAD 78 | 10/28/2015 | NOT VERIFIED | Details CEM-3701 Report |
1000141 | Project ID: 1000141 DEA: 033G0404 EFIS: 0323000118 | 03-YOL-16-0.6/3.9,5.7/6.0 | RHMA, PARTIAL DEPTH RECYCLING, & REPLACE AC SURFACING. | YOLO COUNTY NEAR RUMSEY FROM COLUSA COUNTY LINE TO CACHE CREEK BRIDGE AND FROM 0.6 TO 0.4 MILE WEST OF RUMSEY CANYON BRIDGE | 1 (04/17/2024) | Details CEM-3701 Report | |
214788 | Project ID: 214788 DEA: 032H4604 EFIS: 0317000114 | 03-YOL-84-13.3/15.7 | PLACE HMA AND ROADWAY EXCAVATION. | YOLO COUNTY NEAR WEST SACRAMENTO FROM 3.7 MILES NORTH OF CLARKSBURG ROAD TO 4.0 MILES NORTH OF BABEL SLOUGH ROAD | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
909 | Project ID: 909 DEA: 031A9504 | 03-YOL-505-0.7/r22.4 | REPLACE CONCRETE PAVEMENT AND REHABILITATE SHOULDERS AND RAMPS | YOLO COUNTY NEAR WINTERS FROM 0.3 MILE NORTH OF ROUTE 128/505 SEPARATION TO ROUTE 5/505 SEPARATION | 10/14/2011 | 1 (10/14/2011) | Details CEM-3701 Report |
1246 | Project ID: 1246 DEA: 033M8904 | 03-YOL-113-11.3/22.0 | PLACE MICRO-SURFACING, MODIFIED BINDER SEAL COAT & HMA (OPEN GRADED). | YOLO COUNTY NEAR WOODLAND AND AT KNIGHTS LANDING FROM 5/113 SEPARATION TO SACRAMENTO RIVER BRIDGE | 12/17/2012 | 1 (03/10/2011) | Details CEM-3701 Report |
993567 | Project ID: 993567 DEA: 032G3304 EFIS: 0321000087 | 03-YOL-16-21.6/38.1 | CLEAN AND INSPECT CULVERT AND PLACE CURED-IN-PLACE PIPELINER. | YOLO COUNTY NEAR WOODLAND AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF TABERS CORNER TO 0.4 MILE EAST OF COUNTY ROAD 22 | 01/19/2023 | 1 (02/15/2022) | Details CEM-3701 Report |