Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17551-17560 of 17751 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211429Project ID: 211429
DEA: 073X0214
EFIS: 0713000398
07-VEN-150-27.4,29.4REPAIR SLOPE FAILURE.VENTURA COUNTY NEAR SANTA PAULA AT 1.1 MILES WEST OF SISAR CREEK AND AT 0.8 MILE SOUTH OF SANTA PAULA CREEK06/16/20211 (06/06/2016)Details CEM-3701 Report
4077Project ID: 4077
DEA: 07272604
07-VEN-101-R33.2/R34.7Clear and line culverts.VENTURA COUNTY NEAR SOLIMAR BEACH AT VARIOUS LOCATIONS FROM 0.5 MILE NORTH OF ROUTE 1 /101 SEPARATION TO DULAH ROAD UNDERCROSSING09/14/20111 (01/06/2012)Details CEM-3701 Report
213321Project ID: 213321
DEA: 074T8604
EFIS: 0716000219
07-VEN-118-12.6/13.7INSTALL TRAFFIC SIGNAL, METAL GUARDRAIL SYSTEM, SIGNS AND STRIPING.VENTURA COUNTY NEAR SOMIS AND MOORPARK AT VARIOUS LOCATIONS FROM 0.5 MILE EAST AND 0.5 MILE WEST OF BALCOM CANYON ROAD08/11/20201 (07/23/2019)Details CEM-3701 Report
213584Project ID: 213584
DEA: 074W2804
EFIS: 0718000113
07-VEN-33-6.3/11.2APPLY SLURRY SEAL COAT AND REPLACE ASPHALT CONCRETE SURFACING.VENTURA COUNTY NEAR VENTURA FROM 0.1 MILE SOUTH OF PARKVIEW DRIVE TO ROUTE 15006/05/20201 (09/10/2018)Details CEM-3701 Report
7792Project ID: 7792
DEA: 07228204
EFIS: 0700000378
07-VEN-1-22.5/22.9REPLACE SEAWALL AND REPAIR SHOULDER.VENTURA COUNTY NEAR VENTURA FROM 1.0 MILE NORTH OF VENTURA OVERHEAD TO 4.8 MILE SOUTH OF SEACLIFF OVERHEAD AND SEPARATION02/02/20151 (12/03/2012)Details CEM-3701 Report
214708Project ID: 214708
DEA: 07323904
EFIS: 0716000072
07-VEN-1-21.3/28.4COLD PLANE AC, PLACE RUBBERIZED HOT MIX ASVENTURA COUNTY NEAR VENTURA FROM ROUTE 1/101 SEPARATION TO MOBIL PIER ROAD. 1 (07/12/2021)Details CEM-3701 Report
993663Project ID: 993663
DEA: 072965U4
EFIS: 0719000049
07-VEN-1,33-28.2,15.8,16.1CONSTRUCT BRIDGE RAILING.VENTURA COUNTY ON ROUTE 1 AT WILLOW CREEK BRIDGE AND ON ROUTE 33 AT NORTH FORK MATILIJA CREEK BRIDGES01/02/20241 (05/11/2022)Details CEM-3701 Report
4377Project ID: 4377
DEA: 074L5704
EFIS: 0700000903
07-VEN-150,150-28.5/ 28.6REPAIR &VENTURA COUNTY ON ROUTE 33 ABOUT 20 KM NORTH OF WHEELER SPRINGS AT 0.2 KM NORTH OF TULE CREEK BRIDGE AND AT 0.3 KM SOUTH OF DERRYDALE CREEK BRIDGE AND ON ROUTE 150 NEAR SANTA PAULA AT SANTA PAULA CREEK BRIDGE02/02/20151 (06/21/2012)Details CEM-3701 Report
214216Project ID: 214216
DEA: 071XM404
EFIS: 0719000232
07-VEN-33-22.16, 22.16This is the emergency project to repair pavement cracking, stabilize the eroded slope, construct a soldier pile tieback wall and reconstruct the steel post MGSVentura County on Route 33 at PM.22.16.10/06/20221 (08/27/2019)Details CEM-3701 Report
215686Project ID: 215686
DEA: 074W5904
EFIS: 0719000101
07-VEN-33-11.2/29.6,40.0/48.5PLACE SLURRY SEAL AND REPLACE THERMOPLASTIC TRAFFIC STRIPEVENTURA COUNTY ON ROUTE 33 FROM ROUTE 150 TO TULE CREEK AND FROM 1.0 MILE NORTH OF ADOBE CANYON TO LOCKWOOD VALLEY ROAD10/06/20221 (08/17/2021)Details CEM-3701 Report