Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16931-16940 of 17605 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211404 | Project ID: 211404 DEA: 041J6904 EFIS: 0414000333 | 04-SF-101,280-3.5/4.0,R6.7 | UPGRADE FENCES AND GATES | THE CITY AND COUNTY OF SAN FRANCISCO ON ROUTE 101 FROM 22ND STREET PEDESTRIAN OVERCROSSING TO 18TH STREET PEDESTRIAN OVERCROSSING AND ON ROUTE 280 AT 0.1 MILE NORTH OF 20TH STREET OVERCROSSING | 01/30/2018 | 1 (09/14/2016) | Details CEM-3701 Report |
212063 | Project ID: 212063 DEA: 044G9504 EFIS: 0413000235 | 04-SCL,SF,SM-84,85,92,101,237,etc-VAR | PUMP HOUSE SAFETY AND ACCESS IMPROVEMENTS AND IRRIGATION REMOVAL | THE CITY AND COUNTY OF SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS. | 12/21/2017 | 1 (03/02/2017) | Details CEM-3701 Report |
993616 | Project ID: 993616 DEA: 07357204 EFIS: 0719000061 COOP: 075210 | 07-LA-210-20.7/21.7 | The City of La Canada Flintridge, in partnership with Caltrans, is preparing to construct three sound wall segments, S311, S335, and S336, along the Interstate 210 (I-210). | The City of La Canada Flintridge, in partnership with Caltrans, is preparing to construct three sound wall segments, S311, S335, and S336, along the Interstate 210 (I-210). | 2 (03/02/2022) | Details CEM-3701 Report | |
215221 | Project ID: 215221 DEA: 07332604 EFIS: 0716000287 | 07-LA-10-R12.4/14.9 | REMOVE RAISED ISLAND, CONSTRUCT CONCRETE BARRIER AND INSTALL LIGHTING. | THE COUNTY AND CITY OF LOS ANGELES FROM 0.1 MILE EAST OF ARLINGTON AVENUE OVERCROSSING TO 0.7 MILE EAST OF ROUTE 10/110 SEPARATION | 1 (03/19/2021) | Details CEM-3701 Report | |
1374 | Project ID: 1374 DEA: 040435E4 EFIS: 0400000049 | 04-SF-80-4.9/5.9 | LANDSCAPING, LIGHTING, CONCRETE WORK, GRADING, FENCING | THE COUNTY AND CITY OF SAN FRANCISCO FROM FIFTH STREET TO THE SAN FRANCISCO-OAKLAND BAY BRIDGE | 05/26/2016 | 1 (09/27/2010) | Details CEM-3701 Report |
211661 | Project ID: 211661 DEA: 120P1904 EFIS: 1215000050 MINOR: 12A1621 | 12--5-13.57 | Involves removing (4) Electroliers and installing (5) Electroliers. | The Department of Transportation (Department) will receive sealed bids for CONSTRUCTION ON STATE HIGHWAY IN City of Mission Viejo. District-County-Route-Post Mile: 12-Ora-Route 5-PM 13.57. (Crown Valley Parkway) | 06/21/2021 | 1 (09/01/2016) | Details CEM-3701 Report |
993328 | Project ID: 993328 DEA: 120R7604 EFIS: 1219000033 MINOR: 12A1873 | 12-ORA-1-7.88 | Modify Existing Electrical System | The Department of Transportation (Department) will receive sealed bids for CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY, IN LAGUNA BEACH ON ROUTE 1 AT THE INTERSECTION OF THALIA | 07/02/2024 | 1 (10/15/2021) | Details CEM-3701 Report |
209698 | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 | 07-LA-I-5-45.4/54 | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. | 2 (02/03/2021) | Details CEM-3701 Report | |
213562 | Project ID: 213562 DEA: 043K2304 EFIS: 0417000116 | 04-ALA-I-880- | Construction of three new commuter parking lot facilities within Caltrans right-of-way under the Interstate 880 (I-880), I-80 and I-580 freeways to serve as park and ride lots for commuters. | the I-80/I-580/Buchanan Street interchange in the City of Albany (Location 1), and the I-880/Fruitvale Avenue interchange (Location 2) and I-880/High Street interchange (Location 3) in the City of Oakland. | 06/08/2022 | 2 (08/19/2019) | Details CEM-3701 Report |
215568 | Project ID: 215568 DEA: 044H4404 EFIS: 0413000251 | 04-CC-4-33.4/0 | The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width. | The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. | 2 (03/11/2021) | Details CEM-3701 Report |