Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16881-16890 of 17549 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1374Project ID: 1374
DEA: 040435E4
EFIS: 0400000049
04-SF-80-4.9/5.9LANDSCAPING, LIGHTING, CONCRETE WORK, GRADING, FENCINGTHE COUNTY AND CITY OF SAN FRANCISCO FROM FIFTH STREET TO THE SAN FRANCISCO-OAKLAND BAY BRIDGE05/26/20161 (09/27/2010)Details CEM-3701 Report
211661Project ID: 211661
DEA: 120P1904
EFIS: 1215000050
MINOR: 12A1621
12--5-13.57Involves removing (4) Electroliers and installing (5) Electroliers.The Department of Transportation (Department) will receive sealed bids for CONSTRUCTION ON STATE HIGHWAY IN City of Mission Viejo. District-County-Route-Post Mile: 12-Ora-Route 5-PM 13.57. (Crown Valley Parkway)06/21/20211 (09/01/2016)Details CEM-3701 Report
993328Project ID: 993328
DEA: 120R7604
EFIS: 1219000033
MINOR: 12A1873
12-ORA-1-7.88Modify Existing Electrical SystemThe Department of Transportation (Department) will receive sealed bids for CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY, IN LAGUNA BEACH ON ROUTE 1 AT THE INTERSECTION OF THALIA07/02/20241 (10/15/2021)Details CEM-3701 Report
209698Project ID: 209698
DEA: 072332E4
EFIS: 0700000391
COOP: 0705187
07-LA-I-5-45.4/54Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita ValleyThe I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. 2 (02/03/2021)Details CEM-3701 Report
213562Project ID: 213562
DEA: 043K2304
EFIS: 0417000116
04-ALA-I-880-Construction of three new commuter parking lot facilities within Caltrans right-of-way under the Interstate 880 (I-880), I-80 and I-580 freeways to serve as park and ride lots for commuters.the I-80/I-580/Buchanan Street interchange in the City of Albany (Location 1), and the I-880/Fruitvale Avenue interchange (Location 2) and I-880/High Street interchange (Location 3) in the City of Oakland.06/08/20222 (08/19/2019)Details CEM-3701 Report
215568Project ID: 215568
DEA: 044H4404
EFIS: 0413000251
04-CC-4-33.4/0The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width.The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. 2 (03/11/2021)Details CEM-3701 Report
213226Project ID: 213226
DEA: 010A7604
EFIS: 0100020337
Permit Numbers: 0117NOP0577 0118NDP0005
01-MEN-101-R23.33-R23.58Talmage Road InterchangeThe north-south project limits extend from the SB off-ramp at approximately U.S. 101 PM R23.58 to the SB on-ramp at approximately U.S. 101 PM R23.33. The east-west project limits extend from western edge of the existing Talmage Road (S.R.)09/06/2019NOT VERIFIEDDetails CEM-3701 Report
214577Project ID: 214577
DEA: 11430044
EFIS: 1117000131
COOP: 118440
11-SD-67-2.64he State Route 67 (SR-67) and Woodside Avenue Improvements Project (Project) is located within Santee, California in San Diego County. The City of Santee (City) in cooperation with the California Department of Transportation (Caltrans) will modify the existing intersection at the southbound SR-67 ofThe project encompasses limits from Station "FR-5A" 166+56 (PM 2.64) to Station "NW-WOOD A" 179+51 (PM 2.78) along Woodside Avenue to State Route 67, and from Station "FR-5A" 171+86 to Station "WD-1A" 175+45 along N Woodside Avenue to Woodside Avenue. 2 (12/09/2019)Details CEM-3701 Report
210268Project ID: 210268
DEA: 044H2904
EFIS: 0413000204
COOP: 042567
04-SCL-237,101-2.7/3.3,45.4/45.8Mathilda Avenue Interchange Improvements at State Route 237 and US 101The Project extends from Almanor Avenue/Ahwanee Avenue to Innovation Way and includes on- and off-ramp improvements at the SR 237/Mathilda Avenue and US 101/Mathilda Avenue interchanges.08/03/20202 (01/07/2019)Details CEM-3701 Report
214924Project ID: 214924
DEA: 080M9004
EFIS: 0812000248
COOP: 081695
08-RIV-111-18.0/19.0The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca.The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. 2 (04/22/2020)Details CEM-3701 Report