Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16731-16740 of 17716 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209107Project ID: 209107
Permit Numbers: 0212NSN0401
02-SHA-299-25.2/25.7Construct improvements to the SR299/Churn Creek Road Intersection in accordance with signed and stamped approved plans dated April 5, 2013, specifications, and all approved addendums to include; AC overlay of eastbound on and off-ramps, eastbound off-ramp signalization at Churn Creek Road, overlay,SR299/Churn Creek interchange, Redding04/05/20172 (06/20/2014)Details CEM-3701 Report
3376Project ID: 3376
Permit Numbers: 06106DP0087
06-FRE-33-61.18Reconstruct Bass Avenue intersection at FRE/33/62.506 with new left turn lane in SB FRE/33, new right turn lane in NB FRE/33 and new signal system. Construct a new public road approach at FRE/33/62.705 (Lozano Street).SR3304/27/20182 (12/05/2014)Details CEM-3701 Report
3030Project ID: 3030
Permit Numbers: 0608NSN1013
06-FRE-33-61.18/61.18The proposed project includes the widening of State Route 33. In conjunction with said widening, striping, signage, pavement and concrete walk/returns are to be constructed. The installation of traffic signals are proposed at the intersection of Bass AvSR33, Mendota04/27/20182 (11/25/2014)Details CEM-3701 Report
210535Project ID: 210535
Permit Numbers: 0614NOP0442 0615NRW0472
06-KER-46-49/49Enter upon the State Highway Right-of-way on State Route 46 (SR-46) in Wasco at and near the SR-46 (Paso Robles Highway)/Central Avenue Intersection (PM 49.5) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Wasco?s Central Avenue, and Margalo StSR46 (Paso Robles Hwy), Wasco04/04/20191 (06/17/2015)Details CEM-3701 Report
213332Project ID: 213332
Permit Numbers: 06186SN0167 06186RT1205
06---20.41/20.66Enter upon right of way of Hwy.-46 @ Hwy.-33 to setup & maintain required traffic control to remove the existing signal standards & MBGR, replace with a new Type 23-3-100 signal standards & Type 16B MBGR per the attached approved plans.SR46, Lost Hills11/30/00-11 (12/07/2018)Details CEM-3701 Report
3038Project ID: 3038
DEA: 060J8604
EFIS: 0600000202
COOP: 061395
Permit Numbers: 0609NSN0311 0609NDP0434
06-KER-58-58.4RTE 58 /FAIRFAX ROAD OVERCROSSING INTERCHANGE; INSTALL NEW TRAFFIC SIGNALSSR58, Bakersfield06/04/20202 (06/05/2018)Details CEM-3701 Report
208826Project ID: 208826
DEA: 060G8504
EFIS: 0600020167
COOP: 061535
Permit Numbers: 0613NMC0437
06-KER-58-52.7/55.5Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the CSR58, Bakersfield08/27/20182 (07/24/2013)Details CEM-3701 Report
5524Project ID: 5524
EFIS: 0000001155
Permit Numbers: 1007NMC0669 10086DP0495
10-AMA-88-22.69/22.69Construct new right turn lane, lengthen storage of left turn, modify existing signal and loops, as shown on the attached plans and electrical specifications, within State Highway 88 right of way at Ridge Road in the Town of Pine Grove in Amador County. TSR88 @ Ridge Road, Pine Grove02/24/2014NOT VERIFIEDDetails CEM-3701 Report
3381Project ID: 3381
EFIS: 0000001155
Permit Numbers: 0610NMC0429
06-MAD-99-13.15/13.15Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near PM 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 Overcrossing ProjectSR99, Madera06/11/20182 (12/05/2014)Details CEM-3701 Report
3389Project ID: 3389
EFIS: 0000001155
Permit Numbers: 0611NDP0645
06-MAD-99-13.15/13.15Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near Post Mile 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 OvercrossingSR99, Madera07/30/20182 (12/05/2014)Details CEM-3701 Report