Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16531-16540 of 17602 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210055Project ID: 210055
Permit Numbers: 1012NMC0750
10-SJ-4-17.61/17.61Install Emergency Vehicle Preemption System at the intersections of State Highway 4 westbound ramps and Wilson Way, and State Highway 4 eastbound ramps and Wilson, as shown on the approved plans. The work also includes the installation of a City of Stockton Pan-Tilt Zoom (PTZ) Closed-Circuit TelevSR 4, Stockton02/06/20151 (11/17/2014)Details CEM-3701 Report
212923Project ID: 212923
Permit Numbers: 1016NMC0531 1017NRT0598
10---18.6Install and maintain in perpetuity the Emergency Vehicle Preemption System at the intersection of Filbert Street and the on/off ramps of State Route 4 in Stockton, as shown on the approved plans. The preemption system will include the installation of Optical detectors on the traffic signal poles,SR 4, Stockton01/22/20201 (12/05/2017)Details CEM-3701 Report
213900Project ID: 213900
Permit Numbers: 10186RC0212 1019NRD0156 10196RT0567 10196RW0626
10---19.866Construct a commercial driveway located at the intersection of Stagecoach and East Farmington Road/ State Highway 4 in the City of Stockton. Work includes removing existing driveway and culvert, installing new driveway and culverts, installing driveway curb, valley gutter, curb cut, removing traffiSR 4, Stockton11/09/20211 (08/15/2019)Details CEM-3701 Report
993216Project ID: 993216
Permit Numbers: 10206MC0848 1021NRD0810 10226RT0042
10---15.078Improve State Highway 4 right of way located at the intersection of Fresno Avenue in the City of Stockton. Work includes pavement widening, new and improve pedestrian facilities, replacing existing pork chop divider, construction of new curb ramps, traffic signal modifications, drainage improvementSR 4, Stockton08/29/20221 (08/25/2021)Details CEM-3701 Report
995012Project ID: 995012
Permit Numbers: 10226MC0255
10---14.74Improve SR 4/Fresno Avenue intersection.SR 4, Stockton 1 (07/27/2023)Details CEM-3701 Report
215737Project ID: 215737
Permit Numbers: 0418NOP1441 0420NRT2951 0420NRT2952
04---11.2/15.5The project proposes widening the inside median of SR4 in both directions from east of Milano Way/Glacier Drive to east of SR242.Widen State Route 4 from inside median in both direction from east of Milano/Glacier Drive to State Route 242, outside widening of State Route 4 of both directions from PSR 4/680 Interchange and SR4 widening , Martinez and Concord NOT VERIFIEDDetails CEM-3701 Report
211078Project ID: 211078
DEA: 060U2604
EFIS: 0615000267
Permit Numbers: 0614AOP0910
06-FRE-41-3.0/3.2Riverstone Village Development Project: Riverstone Village, as part of its residential development proposes to construct a second left turn pocket on northbound State Route 41 at Avenue 12. Improvements include a median and striped bicycle lane between the thru and right turn lanes. Additionally, AvSR 41 & Avenue 1210/30/20172 (02/23/2016)Details CEM-3701 Report
3354Project ID: 3354
DEA: 060M0904
06-KER-41-0.3SLIDE REMOVAL & SLOPE STABILIZATIONSR 41 0.3 MILES EAST OF KERN/SLO COUNTY LINE. SLIDE REMOVAL & SLOPE STABILIZATION **DIRIECTORS ORDER**11/04/20111 (11/04/2011)Details CEM-3701 Report
210136Project ID: 210136
DEA: 060T3204
EFIS: 0615000062
COOP: 061607
06-FRE-41-23.1/23.5CONSTRUCT AUXILIARY LANE ON SB 41 DISTRICT 06-1657SR 41 FROM O STREET TO TULARE AVENUE12/07/20181 (02/05/2015)Details CEM-3701 Report
213271Project ID: 213271
DEA: 101J6804
EFIS: 1018000201
10-MPA-49-31.0/R34.6Slipout Repair at Multiple locationsSR 49 in Mariposa County post mile 31.0/R34.608/02/20231 (07/22/2019)Details CEM-3701 Report