Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15561-15570 of 16334 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
4762 | Project ID: 4762 EFIS: 0000001155 Permit Numbers: 0808NMC1221 | 08-RIV-74-28.767/29.287 | Enter onto State Route 74 right of way at Antelope Road and Palomar Road, in the City of Menifee, for Phase III highway improvement project to widen the highway including the construction of new AC pavement, AC overlay, storm drain, traffic signal, sidewalk | State Route 74 , Menifee | 06/08/2012 | NOT VERIFIED | Details Personnel CEM-3701 Report |
213673 | Project ID: 213673 Permit Numbers: 11186UJ0656 | 11--76-12.01/12.01 | enter upon State Highway right of way in San Diego County, Community of Bonsall, on Route 76, post mile 12.01, to install 4-inch PE gas pipe line within 6-inch Steel Casing by Horizontal Directional Drilling (HDD) method, as shown on the attached plans, in accordance with the requirements and condi | State Route 76, Bonsall | 08/18/2021 | 1 (08/18/2021) | Details Personnel CEM-3701 Report |
213818 | Project ID: 213818 Permit Numbers: 11186MC0444 11196RT0258 | 11---4.53/-1 | enter upon State Highway right of way in San Diego County, City of Oceanside on Route 76, post mile R4.53, to install new traffic signals at the intersection of Mission Gate Drive and Mission Avenue, as shown on the attached plans, in accordance with the requirements and conditions contained herein | State Route 76, Oceanside | 08/24/2021 | 1 (06/14/2019) | Details Personnel CEM-3701 Report |
4760 | Project ID: 4760 Permit Numbers: 0808NMC0594 0809NRT0367 08096DP05163 | 08-RIV-79-29.88/29.88 | Enter onto State Route 79 (Ramona Expressway) right-of-way at Sanderson Avenue intersection, in City of San Jacinto, to provide street improvements by adding an additional left-turn lane and through-lane on all four approaches of the intersection, AC over | State Route 79 (Ramona Expressway), San Jacinto | 07/03/2009 | NOT VERIFIED | Details Personnel CEM-3701 Report |
4791 | Project ID: 4791 EFIS: 0000001155 Permit Numbers: 0809NMC0225 | 08-RIV-79-7.6/8 | Enter onto State Route 79 (Winchester Road) right-of-way at Clinton Keith Road/Benton Road, in the City of Murrieta, to widen the southbound State highway and to add the fourth leg of the street intersection (Clinton Keith Road) which include but not limit | State Route 79 (Winchester Road), Murrieta | 08/30/2012 | 2 (08/30/2012) | Details Personnel CEM-3701 Report |
5195 | Project ID: 5195 DEA: 080K4004 EFIS: 0800000345 Permit Numbers: 0811NMC0640 0811NMC0640 | 08-RIV-79-7.63/8.44 | Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sig | State Route 79 (Winchester Road), Murrieta | 07/31/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |
5196 | Project ID: 5196 DEA: 08464614 EFIS: 0800001041 Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148 | 08-RIV--12.2/15.8 | Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & lig | State Route 79 (Winchester Road), Murrieta area | 1 (05/17/2012) | Details Personnel CEM-3701 Report | |
7273 | Project ID: 7273 EFIS: 0000001155 Permit Numbers: 08126RT0181 | 08-RIV-79-18.47/18.472 | Enter onto State Route 79 right-of-way at Stetson Avenue, in Winchester area, Riverside County, to perform roadway improvements including pavement widening, AC overlay, sidewalk, curb gutter, street lights, pedestrian access ramps, traffic signal. | State Route 79 (Winchester Road), Winchester | 01/07/2007 | 1 (01/07/2007) | Details Personnel CEM-3701 Report |
4742 | Project ID: 4742 EFIS: 0000001155 Permit Numbers: 08086CD0771 | 08-RIV-79-14.8/15.6 | Enter onto State Route 79 right-of-way between Temecula Creek Road and Horizontal View Street, near Temecula area, to construct street improvement which includes AC pavement, curb, sidewalk, signs, striping, concrete raised median, catch basin, storm drain | State Route 79 , Temecula Area | 06/08/2012 | NOT VERIFIED | Details Personnel CEM-3701 Report |
208633 | Project ID: 208633 Permit Numbers: 0811NRW1041 0811NMC0027 0811NUM0028 08126DP0175 0811NRW1042 0812NRT1145 0812NRT1144 08126RT1146 | 08-RIV-79-13.8/13.8 | Enter onto State Route 79 right-of-way at Craig Road to extend the existing 16\" diameter steel casing and the 10\" diameter water pipeline beyond the State\'s Right-of-Way using open trench method as per plans date stamped February 15, 2011 by the Depart | State Route 79, County | 06/11/2013 | 1 (02/26/2013) | Details Personnel CEM-3701 Report |