Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15481-15490 of 16314 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210180Project ID: 210180
DEA: 101C9004
EFIS: 1014000185
10-STA-5,27-41.0/51.0REPAIR FAILED AREAS AND RUBBERIZED HMA RESURFACING.STANLISLAUS COUNTY AT AND NEAR LA GRANGE FROM 2.2 MILES EAST OF TOULUMNE RESORT RIGHT TO TOULUMNE COUNTY LINE.11/14/20162 (01/30/2015)Details Personnel CEM-3701 Report
6807Project ID: 6807
DEA: 120L9304
EFIS: 1200020246
MINOR: 12A1363
12-ORA-39-Construct Wash Rack at the Stanton Maintenance StationStanton Maintenance Station09/28/2012NOT VERIFIEDDetails Personnel CEM-3701 Report
2372Project ID: 2372
DEA: 044A5354
04-ALA,CC-4,24-VARINSTALL WIRELESS MAGNETOMETER VEHICLE DETECTION STATIONState Highway (various locations) in Alameda/Contra Costa counties.05/05/20111 (05/05/2011)Details Personnel CEM-3701 Report
209233Project ID: 209233
Permit Numbers: 1013NMC0028
10-SJ-4-15.05/15.16Widen, stripe, and place sidewalk, curb, gutter, and curb ramp, as shown on the plans, within State Highway 4 right of way at Fresno Avenue in the City of Stockton in San Joaquin County. This Permit also allows to widen State Highway 4 westbound for rightState Highway 4 right of way at Fresno Avenue in the City of Stockton in San Joaquin County12/04/20181 (12/19/2013)Details Personnel CEM-3701 Report
4698Project ID: 4698
Permit Numbers: 08076DP0284 0805NMC0777
08-RIV-74-30.566-30.814Modify Traffic SignalState Highway 74 at Briggs Road intersection in the County of Riverside07/29/2010NOT VERIFIEDDetails Personnel CEM-3701 Report
210794Project ID: 210794
DEA: 062HT104
EFIS: 0612000287
06-FRE-99-23.5/26.7(Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST).State Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing.09/16/20201 (10/01/2015)Details Personnel CEM-3701 Report
209507Project ID: 209507
DEA: 100V8304
EFIS: 1012000122
10-SJ-99-31.5/37.5Replace Right of Way FenceSTATE HIGHWAY 99 IN SAN JOAQUIN COUNTYIN AND NEAR LODI AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF TURNER ROAD OVERCROSSING TO 0.3 MILE SOUTH OF LIBERTY ROAD UNDERCROSSING (SOUTH BOUND ONLY)07/28/20211 (04/17/2014)Details Personnel CEM-3701 Report
213959Project ID: 213959
DEA: 100T9104
EFIS: 1000000306
COOP: 10345,10446
10-STA-99-R4.1/F4.9Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing.07/23/20212 (02/21/2019)Details Personnel CEM-3701 Report
212773Project ID: 212773
DEA: 044A8004
EFIS: 0400001164
04-ALA-880-30.5LAKE MERRITT RAILROAD BRIDGE REPLACEMENTSTATE HIGHWAY IN ALAMEDA COUNTY IN OAKLAND AT LAKE MERRITT CHANNEL 1 (09/09/2019)Details Personnel CEM-3701 Report
994269Project ID: 994269
DEA: 061B1804
EFIS: 0620000156
MINOR: 06A2800
06-FRE-41-06-06-Fre-41-R31.7 State Highway In FRESNO COUNTY IN FRESNO AT FRIANT AVENUE RAMPS 1 (09/19/2022)Details Personnel CEM-3701 Report