Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13621-13630 of 17201 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214339 | Project ID: 214339 DEA: 081G0004 EFIS: 0815000107 | 08-RIV-95-14.5/35.6 | CONSTRUCT CONCRETE/RSP APRONS | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM 4 MILES NORTH OF PALO VERDE DAM ROAD TO 0.6 MILE SOUTH OF SAN BERNARDINO COUNTY LINE | 03/01/2022 | 1 (12/02/2020) | Details CEM-3701 Report |
1000082 | Project ID: 1000082 DEA: 081J8704 | 08-RIV-15-16.3/52.3 | MINOR CONCRETE, HMA (TYPE A), MODIFYING SIGNAL AND LIGHTING SYSTEMS. | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM BUNDY CANYON ROAD UNDERCROSSING IN WILDOMAR TO PHILADELPHIA STREET UNDERCROSSING IN EASTVALE | 1 (02/06/2024) | Details CEM-3701 Report | |
994169 | Project ID: 994169 DEA: 081H2004 EFIS: 0816000177 | 08-RIV-10-R92.9/R101.1 | RDWY EXC, STR EXC, CLASS 2 AB, PARTIALLY GROUTED RSP, CHAIN LINK FENCE | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM KRUME DITCH TO WIDE DITCH | 1 (12/16/2022) | Details CEM-3701 Report | |
212067 | Project ID: 212067 DEA: 081G2404 EFIS: 0815000179 | 08-RIV-15-41.8/51.5 | BRIDGE DECK REHAB, JOINT SEAL REPLACEMENT, AND SHEAR KEY REPAIR | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM PARKRIDGE AVENUE UNDERCROSSING TO ROUTE 15/60 SEPARATION | 08/16/2023 | 1 (08/07/2017) | Details CEM-3701 Report |
5098 | Project ID: 5098 DEA: 080M6504 | 08-RIV-91-R1.1/15.1 | BRIDGE DECK REHABILITATION ON ROUTE 91 IN RIVERSIDE COUNTY. | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM PRADO ROAD OVERHEAD TO MONROE STREET UNDERCROSSING. | 07/02/2012 | 1 (07/02/2012) | Details CEM-3701 Report |
5099 | Project ID: 5099 DEA: 080M6604 | 08-RIV-15-2.9/51.9 | RESURFACE BRIDGE DECK, REPLACE JOINT SEALS AND APPROACH SLAB | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM TEMECULA RIVER BRIDGE TO MISSION BOULEVARD OVERHEAD | 08/22/2012 | 1 (08/22/2012) | Details CEM-3701 Report |
213765 | Project ID: 213765 DEA: 081J1804 EFIS: 0817000221 | 08-RIV-10-R105.2/R135.1 | REPLACE ASPHALT CONCRETE SURFACING & UPGRADE TRAFFIC STRIPING | RIVERSIDE COUNTY FROM 0.1 MILE EAST OF ROUTE 177 TO 0.1 MILE EAST OF WILEY WELL OVERCROSSING | 06/23/2021 | 1 (02/06/2019) | Details CEM-3701 Report |
212911 | Project ID: 212911 DEA: 081F9404 EFIS: 0815000067 | 08-RIV-79-R4.7/R10.6 | COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (TYPE G) | RIVERSIDE COUNTY FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD TO 0.1MILE NORTH OF ABELIA ROAD | 06/23/2021 | 1 (12/28/2018) | Details CEM-3701 Report |
212689 | Project ID: 212689 DEA: 081C0604 EFIS: 0812000256 | 08-RIV-10-44.4/51.7 | COLD PLANE AND OVERLAY RUBBERIZED HOT MIX ASPHALT (TYPE G) | RIVERSIDE COUNTY FROM 0.1 MILE WEST OF MONTEREY AVENUE OVERCROSSING TO 0.6 MILE WEST OF JEFFERSON STREET OVERCROSSING | 06/23/2021 | 1 (03/14/2018) | Details CEM-3701 Report |
211242 | Project ID: 211242 DEA: 081G0804 EFIS: 0815000123 | 08-RIV-10-R134.3/R144.1 | REHABILITATE PAVEMENT | RIVERSIDE COUNTY FROM 0.7 MILE WEST OF WILEY'S WELL ROAD TO 1.0 MILE WEST OF MESA DRIVE | 06/23/2021 | 1 (09/21/2016) | Details CEM-3701 Report |