Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13421-13430 of 18023 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215778 | Project ID: 215778 MINOR: 11A3084 | 11--805-18.5 | Transformer & Meter Pedestal | On Route 805 @ Friars Road before Murray Ridge Road | 1 (05/28/2021) | Details CEM-3701 Report | |
210040 | Project ID: 210040 DEA: 04297624 EFIS: 0400020581 COOP: 042558 | 04-ALA-84-22.9/25.7 | WIDENING AND EXPRESSWAY UPGRADES | ON ROUTE 84, FROM RUBY HILL DRIVE TO NORTH OF CONCANNON BOULEVARD | 03/12/2020 | 1 (11/10/2015) | Details CEM-3701 Report |
258 | Project ID: 258 DEA: 01480914 | 01-HUM-96-8.6 | REPAIR ROADWAY SLIPOUT | On Route 96 in Humboldt County | 08/06/2010 | 1 (12/07/2009) | Details CEM-3701 Report |
212596 | Project ID: 212596 DEA: 100L0204 EFIS: 1013000053 | 10-SJ,STA-99-0.0-0.7:24.4-24.8 | Partial Bridge Replacement | ON ROUTE 99 IN RIPON AT THE COUNTY LINE OF SAN JOAQUIN COUNTY AND STANISLAUS COUNTY AT THE STANISLAUS RIVER BRIDGES (29-0013L/R). | 07/15/2021 | 1 (12/19/2018) | Details CEM-3701 Report |
208825 | Project ID: 208825 EFIS: 1012000208 MINOR: 10A1536 | 10-STA-99-R15.4/R16.8 | INSTALL CHAIN LINK RAILING | ON ROUTE 99 IN STANISLAUS COUNTY IN MODESTO FROM SIERRA DRIVE OVERCROSSING TO KANSAS AVENUE OVERCROSSING | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
210652 | Project ID: 210652 DEA: 06360234 EFIS: 0612000241 | 06-TUL-99-35.2/R37.3 | WIDEN HIGHWAY FROM 4-LANES TO 6-LANE. | ON ROUTE 99 IN TULARE COUNTY NEAR VISALIA FROM 1.2 MILE SOUTH OF AVENUE 280 OC (BR NO.46-195) TO 0.9MILE SOUTH OF WEST VISALIA OH (BR NO.46-226) | 08/24/2018 | 1 (07/21/2015) | Details CEM-3701 Report |
993862 | Project ID: 993862 DEA: 101P9204 EFIS: 1022000198 | 10-MER-99-11.81 | TO INSTALL A PIPE LINER IN A FIRE DAMAGED DRAINAGE FACILITY TO PREVENT EROSION OF THE EMBANKMENT. INSTALL A 30" PIPE LINER, FLARED END SECTION, ROCK SLOPE PROTECTION, REGRADE MBANKMENT, AND PLACE PERMANENT EROSION CONTROL. | ON ROUTE 99, IN MERCED COUNTY, AT POST MILE 11.81. | 1 (05/31/2022) | Details CEM-3701 Report | |
222 | Project ID: 222 DEA: 01475904 | 01-MEN-1,128-VAR | REPAIR BRIDGE DECK | On Routes 1, 128, in Mendocino County | 03/11/2011 | 1 (12/02/2009) | Details CEM-3701 Report |
274 | Project ID: 274 DEA: 01482904 | 01-HUM,MEN-36,101-VAR | REPAIR BRIDGE DECK | On Routes 101 and 36, in Humboldt and Mendocino Counties | 03/11/2011 | 1 (12/02/2009) | Details CEM-3701 Report |
994713 | Project ID: 994713 DEA: 051Q8304 EFIS: 0523000078 | 05-SB,SB/SB-VAR,101-VAR, 2.2/2.5 | Repair storm damage and debris cleaning. | On routes 101, 144, 192 @ various PMs. | 08/13/2024 | 1 (04/20/2023) | Details CEM-3701 Report |