Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 311-320 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1000478 | Project ID: 1000478 DEA: 020K6404 EFIS: 0223000189 | 02-SIS-97-18.0/22.4 | CONSTRUCT WILDLIFE OVERPASS, INSTALL CULVERT, AND INSTALL FENCING. | SISKIYOU COUNTY NEAR GRASS LAKE FROM 1.4 MILES NORTH OF DEER MOUNTAIN ROAD TO 0.6 MILE NORTH OF GRASS LAKE REST AREA | 1 (07/31/2024) | Details CEM-3701 Report | |
1000477 | Project ID: 1000477 DEA: 010H4104 EFIS: 0117000169 | 01-HUM-169-15.0/33.8 | CSP, STRUCTURAL CONCRETE, AND RSP. | HUMBOLDT COUNTY NEAR WEITCHPEC AT VARIOUS LOCATIONS FROM 0.6 MILE EAST OF PECWAN CREEK BRIDGE TO ROUTE 96 | 1 (07/31/2024) | Details CEM-3701 Report | |
1000476 | Project ID: 1000476 DEA: 010F7104 EFIS: 0116000047 | 01-MEN-1-6.4/9.5 | HMA-A, ROADWAY EXCAVATION, AND MECHANICALLY STABILIZED EMBANKMENT. | MENDOCINO COUNTY NEAR GUALALA FROM 0.3 MILE NORTH OF HAVENS NECK DRIVE TO GYPSY FLAT ROAD AND FROM 0.5 MILE TO 0.2 MILE SOUTH OF IVERSEN ROAD | 1 (07/31/2024) | Details CEM-3701 Report | |
1000475 | Project ID: 1000475 DEA: 113A5284 EFIS: 1122000136 MINOR: 11A3683 | 11-SD-75-8.9/9.2 | Stripe bike lane and install pedestrian enhancements | In San Diego County in The City of San Diego From 0.1 Mile East to 0.2 Mile West of 75/5 Separation Overcrossing on Route 75 (Palm Ave) | 1 (08/01/2024) | Details CEM-3701 Report | |
1000474 | Project ID: 1000474 DEA: 061G4104 EFIS: 0623000199 MINOR: 06A3030 | 06-FRE-99-168 | Installation of Accessible Pedestrian Signals (APS) and placement of Bike Lane Markings | CONSTRUCTION ON STATE HIGHWAY IN FRESNO COUNTY AT VARIOUS LOCATIONS. | 1 (08/27/2024) | Details CEM-3701 Report | |
1000473 | Project ID: 1000473 EFIS: 1223000114 MINOR: 12A2177 | 12--- | 1 (07/29/2024) | Details CEM-3701 Report | |||
1000471 | Project ID: 1000471 DEA: 060S3704 EFIS: 0614000130 | 06-FRE-41-0/7.1 | Excelsior Expressway II/The project would expand State Route 41 to four lanes. | Fresno and Kings counties, approximately 6 miles north of Lemoore, from 0.3 mile north of the Excelsior Avenue Undercrossing to 1.0 mile north of Elkhorn Avenue. | NOT VERIFIED | Details CEM-3701 Report | |
1000470 | Project ID: 1000470 DEA: 051S0404 EFIS: 0524000162 | 05-MON-1- | 1 (10/10/2024) | Details CEM-3701 Report | |||
1000468 | Project ID: 1000468 DEA: 051P6404 EFIS: 0522000091 | 05-MON-- | 10/28/2024 | 1 (07/23/2024) | Details CEM-3701 Report | ||
1000467 | Project ID: 1000467 DEA: 061F1604 EFIS: 0622000153 MINOR: 06A3023 | 06-FRE-41,99,168- | 1 (07/23/2024) | Details CEM-3701 Report |