Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17911-17920 of 18128 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213919 | Project ID: 213919 DEA: 100P2004 EFIS: 1000000182 COOP: 100487 Permit Numbers: 1019NMC0209 | 10-SJ-120-R3.4 to PM R5.2 | SR 120 / Union Road Interchange. Construction of 4 new bridges and widening 47 feet of the overcrossing, reconstruction of all the ramps, auxiliary lanes on both sides of SR 120, Overhead sign and new traffic signals and lighting. | SR 120 from Airport Way to Union Road and from Union Road to Main Street | 08/04/2021 | 2 (07/31/2019) | Details CEM-3701 Report |
213956 | Project ID: 213956 DEA: 03425504 EFIS: 0300000617 COOP: 030635 | 03-SAC-5-31.1/31.9 | Piles, CIP P/S Concrete Box Girder, Overhead sign structures; est const start: June 2019, Est comp: July 2020. | Local Agency: County of Sacramento; On Interstate 5, from Route 5/70 /99 Separation to Powerline Road Overcrossing. | 07/30/2021 | 2 (02/20/2019) | Details CEM-3701 Report |
213959 | Project ID: 213959 DEA: 100T9104 EFIS: 1000000306 COOP: 10345,10446 | 10-STA-99-R4.1/F4.9 | Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20 | State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing. | 07/23/2021 | 2 (02/21/2019) | Details CEM-3701 Report |
213986 | Project ID: 213986 Permit Numbers: 04166UT0590 04176RT1690 | 04---6.9/6.9 | Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road. | 2370 Hecker pass, Gilroy | 11/30/00-1 | 2 (08/19/2019) | Details CEM-3701 Report |
213988 | Project ID: 213988 DEA: 081E7104 EFIS: 0814000079 | 08--10-31.62/31.92 | I-10 University Street Improvement Project | Post Mile 31.62/31.92 on Interstate 10 in teh City if Redlands,Ca | 2 (03/08/2019) | Details CEM-3701 Report | |
214038 | Project ID: 214038 DEA: 07315404 EFIS: 0715000185 Permit Numbers: 0718AOP2643 0719ART0238 0719ART1716 | 07---3.4/3.8 | Roadway widening of northbound (NB) State Route 213 from 200' south of Avenida Aprenda to 500' north of Green Hills Drive (PM 3.4/3.8). Widening will accommodate the addition of one NB through lane and shoulder, two new bus turnouts, two new driveway approaches to the new development, and mo | Western Avenue (SR-213), Los Angeles/Rancho Palos Verdes | 06/17/2021 | 2 (03/28/2019) | Details CEM-3701 Report |
214019 | Project ID: 214019 DEA: 07309203 EFIS: 0714000267 Permit Numbers: 0716AMC1295 0718ART2606 | 07-LA-605-23.3 | I-605 Ramp Widening & Live Oak Avenue Intersection | The reconstruction of the I-605 Northbound off-ramp at Live Oak Avenue will improve both directions of acce ss to Live Oak Avenue. The direct ramp to eastbound Live Oak Avenue will be widened to provide dual right lanes at Live Oak Avenue, | 06/17/2021 | 2 (03/05/2019) | Details CEM-3701 Report |
214101 | Project ID: 214101 Permit Numbers: 0417NMC1910 | 04-SM-82-9.35-10.07 | The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... | 08/13/2021 | 2 (08/28/2019) | Details CEM-3701 Report | |
214131 | Project ID: 214131 DEA: 080N69U4 EFIS: 0812000307 COOP: 081635 | 08-RIV-60-22.1/22.6 | Improving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages. | R-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively. | 2 (04/30/2019) | Details CEM-3701 Report | |
214168 | Project ID: 214168 DEA: 042358A4 EFIS: 0419000385 | 04-SM-101-16.3/17.1 | Interchange Landscaping Improvemetns | 2 (08/28/2019) | Details CEM-3701 Report |