Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17861-17870 of 18128 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212783 | Project ID: 212783 DEA: 040Q6404 EFIS: 0418000126 COOP: 042675 | 04-SM-101,82,280,1,35-Var | IMPROVE MOBILITY BY DEPLOYING INTELLIGENT TRANSPORTATION SYSTEM (ITS) | CITIES OF DALY CITY, BRISBANE, SOUTH SAN FRANCISCO, AND SAN BRUNO | 2 (08/19/2019) | Details CEM-3701 Report | |
212938 | Project ID: 212938 DEA: 06484634 EFIS: 0615000261 COOP: 17001 | 06-KER-58- | 08/19/2021 | 2 (03/26/2021) | Details CEM-3701 Report | ||
212924 | Project ID: 212924 DEA: 060X0504 EFIS: 0618000014 COOP: 061650 | 06-KER-99-54.5 | Interchange Improvement at Woollornes Avenue and State Route 99 | City of Delano | 08/17/2021 | 2 (07/29/2021) | Details CEM-3701 Report |
212928 | Project ID: 212928 DEA: 07306904 EFIS: 0714000188 | 07-LA-Sierra Hwy-LA 29.24-29.64 | Sierra Highway Pedestrian Bridge & Street Improvements | Sierra Highway in the City of Santa Clarity | 08/19/2021 | 2 (01/31/2018) | Details CEM-3701 Report |
212941 | Project ID: 212941 DEA: 040Q2804 EFIS: 0418000067 COOP: 042750 | 04--880-13.0/14.2 | Modify 880 Interchange | Whipple Road and Industrial Parkway | 2 (11/04/2019) | Details CEM-3701 Report | |
212977 | Project ID: 212977 DEA: 040K2204 EFIS: 0416000067 | 04--80- | 2 (11/04/2019) | Details CEM-3701 Report | |||
213041 | Project ID: 213041 DEA: 07310301 Permit Numbers: 0716AOP1299 | 07--- | 08/06/2018 | 2 (01/09/2018) | Details CEM-3701 Report | ||
213132 | Project ID: 213132 DEA: 03372814 EFIS: 0314000301 Permit Numbers: 0317AOP0994 0318ADP0096 | 03-ED-50-16/16.6 | Western Placerville Interchanges Project Phase 2. Construction of EB auxiliary lane Forni Road, EB off ramp at Ray Lawyer Drive, a storm water detention basin and a signalized intersection at Ray Lawyer Drive. | US 50, Placerville | 07/27/2020 | 2 (02/16/2018) | Details CEM-3701 Report |
213149 | Project ID: 213149 DEA: 043K9704 EFIS: 0417000227 Permit Numbers: 0418NOP2127 | 04-SM-101-6.2 | Construct a joint-use path (Pedestrian under-crossing) under US 101 from Bair Island Road to Convention Way. The Bair Island Road US 101 Undercrossing Project (Project), will connect Bair Island Road east of US 101 | Redwood City, Bair Island Rd connect with Convention Way under 101 | 11/16/2021 | 2 (02/21/2018) | Details CEM-3701 Report |
213176 | Project ID: 213176 DEA: 044G6044 EFIS: 0416000117 COOP: 042684 | 04-SM-82-20.9/21.6 | Grand Boulevard Initiative Complete Streets Program, construct median landscaping and other sustainable green features in SSF | State Route 82 (El Camino Real) from approximately 250' south of Kaiser Way to the McLellan Drive intersection | 2 (11/04/2019) | Details CEM-3701 Report |