Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17841-17850 of 18258 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
5620Project ID: 5620
DEA: 100M2404
10-TUO-108-64.5CONSTRUCT SOLDIER PILE WALLTuolumne County near Kennedy Meadow at 2.5 miles West of Mono County Line.04/17/20111 (12/03/2009)Details CEM-3701 Report
213384Project ID: 213384
DEA: 101C4404
EFIS: 1016000103
10-TUO-108-R0.0/49.99CONSTRUCT RUMBLE STRIP AND PAVEMENT DELINEATION.TUOLUMNE COUNTY NEAR SONORA AT VARIOUS LOCATIONS FROM ROUTE 108/49 TO 0.7 MILE EAST OF CLARKS FORK ROAD.08/02/20191 (04/11/2019)Details CEM-3701 Report
5884Project ID: 5884
DEA: 10340424
EFIS: 1000000394
10-TUO-108-R4.0/R6.0REALIGN HIGHWAY AND CONSTRUCT UNDERCROSSINGS.TUOLUMNE COUNTY NEAR SONORA FROM 0.3 MILE WEST OF PEACEFUL OAK ROAD TO VIA ESTE ROAD04/18/20181 (02/23/2012)Details CEM-3701 Report
5666Project ID: 5666
DEA: 100N3704
10-TUO-108-31.2Repair and replace bridge railTUOLUMNE COUNTY NEAR STRAWBERRY AT SOUTH FORK STANISLAUS RIVER BRIDGE01/04/20131 (03/22/2010)Details CEM-3701 Report
214076Project ID: 214076
DEA: 100Y8004
10-TUO-108-32.5/34.4MODIFY SIDE SLOPE.TUOLUMNE COUNTY NEAR STRAWBERRY AT VARIOUS LOCATIONS FROM 0.6 MILE EAST OF OLD STRAWBERRY ROAD TO 0.7 MILE WEST OF BEARDSLEY ROAD08/31/20201 (04/11/2019)Details CEM-3701 Report
1000552Project ID: 1000552
DEA: 101M9704
EFIS: 1021000068
MINOR: 10A2527
10-TUO-49-22.33/R22.66Drainage System ImprovementTuolumne County near Tuttletown at 0.16 Mile North of Flume Road and at 0.1 Mile North of Portage Road 1 (10/07/2024)Details CEM-3701 Report
7231Project ID: 7231
DEA: 100T4704
EFIS: 1012000013
10-TUO-108-R11.7UPGRADE MBGR AND HMA DIKES.TUOLUMNE COUNTY NEAR TWAIN HARTE AT TWAIN HARTE DRIVE .01/04/20131 (06/18/2012)Details CEM-3701 Report
7358Project ID: 7358
DEA: 100P1604
EFIS: 1000000181
10-TUO-120-8.1/8.5CONSTRUCT ACCELERATION LANE.TUOLUMNE COUNTY NEAR YOSEMITE JUNCTION FROM 0.1 MILE WEST OF LA GRANGE ROAD TO 0.3 MILE EAST OF LA GRANGE ROAD06/19/20131 (08/23/2012)Details CEM-3701 Report
5566Project ID: 5566
DEA: 100G7504
10-TUO-120-R3.5/8.0RUBBERIZED HOT MIX ASPHALT W/ OVERLAYTuolumne County near Yosemite junction from 2.1 miles east of Tulluch Road to 0.2 mile west of La Grange Road.11/23/20091 (12/07/2009)Details CEM-3701 Report
211127Project ID: 211127
Permit Numbers: 05146MC0563 05156RT0701
05-SLO-41-44.66/45.1To provide construction and operations access to the California Flats Solar Project. First Solar will be widening SR41 at Turkey Flat Rd (PM 44.9)to accommodate a northbound left turn lane, a northbound median acceleration lane, and a southbound right turn lane. The geometrics for the left turn lanTurkey Flat Rd, Cholame09/17/2018NOT VERIFIEDDetails CEM-3701 Report