Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17701-17710 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994452 | Project ID: 994452 DEA: 081J9904 EFIS: 0818000153 Permit Numbers: 0822ADP0470 0822AOP0255 | 08-RIV-91-9.2 | Reconstruct and realign SR-91/McKinley interchange consisting of retaining walls, drainage facilities, new overhead signs, signal replacement, ramp metering, interconnect, street lighting, signing/striping | 2 (12/29/2022) | Details CEM-3701 Report | ||
994465 | Project ID: 994465 DEA: 114C0104 EFIS: 1122000100 | 11-SD-SR 78- | New gateway monument sign, planting, irrigation, fencing, and paving treatments. | Escondido | 2 (06/15/2023) | Details CEM-3701 Report | |
994470 | Project ID: 994470 DEA: 042AC404 EFIS: 0420000117 COOP: 042921 Permit Numbers: 0423NOP1554 | 04-CC-- | 2 (03/04/2024) | Details CEM-3701 Report | |||
994508 | Project ID: 994508 DEA: 101C2604 EFIS: 1014000090 | 10--- | 2 (03/20/2023) | Details CEM-3701 Report | |||
994792 | Project ID: 994792 DEA: 051M5704 EFIS: 0520000029 COOP: 050427 | 05-SLO-- | 2 (12/11/2023) | Details CEM-3701 Report | |||
994883 | Project ID: 994883 DEA: 081K0404 EFIS: 0818000187 Permit Numbers: 0822NOP2301 | 08-SBD-SR-210-15.7/16.2 | Interchange Improvements - various additional lanes, roadway widening, SW, C&G, RW, MBGR, striping, pavement markings, signals, and lighting. | SR210/Alder Avenue Interchange in Rialto, CA. | NOT VERIFIED | Details CEM-3701 Report | |
1000171 | Project ID: 1000171 DEA: 07318504 EFIS: 0715000304 COOP: 075257 | 07--- | Modify existing on- and off-ramps to improve safety, access, and efficient operation. | San Pedro, SR-47 PM 0.41 to 0.74 | 2 (03/12/2024) | Details CEM-3701 Report | |
995451 | Project ID: 995451 DEA: 080R8014 EFIS: 0820000075 | 08-SBD-15-0/12 | Construction of one to two HOT lanes in each direction on Interstate 15 between SBD/RIV County Line to Foothill Blvd | Interstate 15 between SBD/RIV County Line to Foothill Blvd | 2 (05/16/2023) | Details CEM-3701 Report | |
994925 | Project ID: 994925 DEA: 101M8104 EFIS: 1021000044 | 10--- | 2 (06/26/2023) | Details CEM-3701 Report | |||
994953 | Project ID: 994953 Permit Numbers: 0523NUR0074 | 05--- | 2 (08/21/2023) | Details CEM-3701 Report |