Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17701-17710 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213847 | Project ID: 213847 DEA: 034H2804 EFIS: 0318000239 MINOR: 03A2859 | 03-YOL-80-5.6 | INSTALL RAMP METER | YOLO COUNTY NEAR DAVIS AT CHILES ROAD ON-RAMP TO EASTBOUND ROUTE 80. | 09/15/2022 | 1 (01/08/2019) | Details CEM-3701 Report |
865 | Project ID: 865 DEA: 030F6204 | 03-YOL-5-R24.6,R26.4 | REPLACE PLASTIC LINERS IN SEWER PONDS AND INSTALL SEWER LINE | YOLO COUNTY NEAR DUNNIGAN AT 1.0 MILE SOUTH OF COUNTY ROAD 6 OVERCROSSING AND AT DUNNIGAN SAFETY ROADSIDE REST AREA | 01/24/2012 | 1 (01/24/2012) | Details CEM-3701 Report |
213182 | Project ID: 213182 DEA: 030C4724 EFIS: 0314000272 | 03-YOL-16-20.5/21.3, 28.2/31.8 | ADD TURN LANES & ROUNDABOUT, ALIGN CURVE, WIDEN SHOULDER, CULVERT WORK | YOLO COUNTY NEAR ESPARTO FROM 0.3 MILE WEST TO 0.4 MILE EAST OF COUNTY ROAD 79 AND FROM 0.1 MILE EAST OF PLAINFIELD STREET TO 0.1 MILE EAST OF COUNTY ROAD 90 | 10/06/2021 | 1 (07/26/2018) | Details CEM-3701 Report |
215602 | Project ID: 215602 DEA: 031G9904 EFIS: 0320000140 | 03-YOL-16-15.4/19.8 | REPLACE CULVERTS & INSTALL CURED-IN-PLACE PIPELINERS. | YOLO COUNTY NEAR GUINDA AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF COUNTY ROAD 68 TO 0.3 MILE EAST OF CACHE CREEK CASINO | 06/27/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
1000205 | Project ID: 1000205 DEA: 033G1204 EFIS: 0323000169 | 03-YOL-16-10.3/13.5 | INSTALL REINFORCED CONCRETE PIPE AND CURED-IN-PLACE PIPELINERS. | YOLO COUNTY NEAR GUINDA AT VARIOUS LOCATIONS FROM ROAD 44 TO ROAD 61 | 1 (05/08/2024) | Details CEM-3701 Report | |
1000142 | Project ID: 1000142 DEA: 033G0604 EFIS: 0323000120 | 03-YOL-45-0.2/12.9 | COLD PLANE AC PAVEMENT, HMA AND SEAL COAT. | YOLO COUNTY NEAR KNIGHTS LANDING FROM SYCAMORE SLOUGH BRIDGE TO COUNTY LINE ROAD | 1 (04/17/2024) | Details CEM-3701 Report | |
215405 | Project ID: 215405 DEA: 032G1604 EFIS: 0320000235 | 03-YOL-45-0.6/12.9 | COLD PLANE AC PAVEMENT AND REPLACE WITH HOT MIX ASPHALT. | YOLO COUNTY NEAR KNIGHTS LANDING FROM SYCAMORE SLOUGH BRIDGE TO YOLO COUNTY LINE ROAD | 06/30/2021 | 1 (01/18/2021) | Details CEM-3701 Report |
214800 | Project ID: 214800 DEA: 031G5204 EFIS: 0318000314 | 03-YOL-505-10.0/21.7 | INSTALL EPDM RUBBER PIPE JOINT SEALS & REPLACE CULVERTS. | YOLO COUNTY NEAR MADISON AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF SOUTH FORK WILLOW SLOUGH BRIDGE TO 0.7 MILE SOUTH OF ROUTE 505/5 SEPARATION | 03/16/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
1201 | Project ID: 1201 DEA: 033M3104 | 03-YOL-505-3.4/17.5 | Overlay Bridge Decks with Methacrylate and Polyester. | YOLO COUNTY NEAR MADISON AT VARIOUS LOCATIONS FROM CHICKAHMNY SLOUGH BRIDGE TO COUNTY ROAD 14 OVERCROSSING | 06/16/2011 | 1 (04/19/2010) | Details CEM-3701 Report |
214348 | Project ID: 214348 DEA: 033H4604 EFIS: 0318000002 | 03-YOL-16-3.9/4.2 | INSTALL CABLE NET DRAPERY SYSTEM. | YOLO COUNTY NEAR RUMSEY AT 0.1 MILE EAST OF CACHE CREEK BRIDGE | 10/06/2021 | 1 (09/16/2019) | Details CEM-3701 Report |