Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17681-17690 of 17845 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
210752 | Project ID: 210752 DEA: 051G7904 | 05-SB-101,154-10.8/22.5,R22.5,R31.3/R32.3, VAR | Water Conservation measures- upgrade irrigation systems with " Smart " irrigation technology to maximie water conservation at various locations in Santa Barbara and Goleta | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report | |
995087 | Project ID: 995087 DEA: 051P5904 EFIS: 0522000086 | 05-SCR-1-0.0/5.0 | Cold plane, RHMA-G | Watsonville area, County line to Scenic pullout | 08/13/2024 | 1 (08/21/2023) | Details CEM-3701 Report |
4236 | Project ID: 4236 DEA: 073X3104 | 07-LA-10-42.6/42.8 | Reconstruct R/W Fence and repair V ditch | WB 10 to NB 57 transition | 08/03/2011 | 1 (08/03/2011) | Details CEM-3701 Report |
4238 | Project ID: 4238 DEA: 073X3404 | 07-LA-105-13.5 | Repair Storm damaged support slopes and and undermine shoulder and soundwall | WB 105 to 719 trans ition. | 06/25/2012 | 1 (06/25/2012) | Details CEM-3701 Report |
212111 | Project ID: 212111 Permit Numbers: 1216NMC0857 | 12--91-2.8/2.8 | Construct two additional lanes to widen the WB SR-91 diamond exit ramp at SR-39(Beach Blvd)in the City of Buena Park, and modify signal timing at Beach Blvd SR-91 off-ramp intersection. The ramp shall be re-striped in compliance with Section 84 of the Standard Specifications. All performed work sh | WB 91 Fway off-ramp at Beach Blvd, Buena Park | 07/15/2021 | 1 (02/14/2017) | Details CEM-3701 Report |
213902 | Project ID: 213902 EFIS: 0707181235 Permit Numbers: 0718NMC1235 0718NRW3010 | 07---18.6 | Install occupancy detection system to existing tolling system. Work includes adding additional gantries & equipment. Occupancy detection system will use existing power source used by tolling equipment. | WB I-10 Express lane, Los Angeles | 06/17/2021 | 1 (05/08/2019) | Details CEM-3701 Report |
7373 | Project ID: 7373 DEA: 073X7804 EFIS: 0712000360 | 07-LA-134-5.6 | Repair Bridge columns and soffit and Roadway and guardrail | WB LA-134 mat transition road to LA 5 | 01/31/2013 | 1 (04/15/2012) | Details CEM-3701 Report |
6460 | Project ID: 6460 EFIS: 0000001155 Permit Numbers: 1208NMC0418 | 12-ORA-22-9.38/9.38 | CONSTRUCT A NEW CITY STREET WHICH WOULD BE A FOURTH LEG OF AN EXISTING INTERSECTION AT WESTBOUND SR-22/METROPOLITAN DRIVE ON/OFF-RAMPS IN THE CITY OF ORANGE. CONSTRUCTION WORK INCLUDES SIDEWALK, CURB & GUTTER, CURB RAMPS AND A NEW STREET. IN ADDITION | WB SR-22 RAMPS, ORANGE | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
2338 | Project ID: 2338 DEA: 04448204 EFIS: 0400001083 | 04-ALA-260-0.6-1.2 | Provide new bus stop. Relocate Sargell Avenue, install new signals for the City of Alameda. | Webster / Wiliver, Stargell, Alameda. Cross street: Willie Stargell Ave. | 05/07/2019 | 2 (09/15/2015) | Details CEM-3701 Report |
208654 | Project ID: 208654 Permit Numbers: 0410NMC1373 04136DP0055 | 04-ALA-61-21.87/21.87 | Webster Street Smart Corridor: implementing ITS elements such as vehicle detectors, CCTV cameras, a trailblazer sign, and wireless communication systems within State R/W. | Webster St. Tube, Webster St. and Central Ave., Alameda | 09/14/2018 | 1 (03/07/2013) | Details CEM-3701 Report |