Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17651-17660 of 17771 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215141 | Project ID: 215141 DEA: 010G7104 EFIS: 0117000052 MINOR: 01A2003 | 01-HUM-96-0.6 | Willow Creek Charging Station | Willow Creek Maintenance Yard | 08/25/2022 | 1 (08/28/2020) | Details CEM-3701 Report |
210703 | Project ID: 210703 Permit Numbers: 04156DP1438 0414NMC1139 0415NRT1459 | 04-SM--27.65/27.65 | Improvements include roadway widening to include an additional eastbound right turn lane,new sidewalk and a Class 1 Bike Path along Willow Rd between the existing railroad tracks and the existing Bay Trail located near Bayfront Expwy. | Willow Road / Bayfront Exp., Menlo Park | 09/14/2018 | 1 (07/29/2015) | Details CEM-3701 Report |
210975 | Project ID: 210975 Permit Numbers: 04156DP2177 0414NMC0989 | 04-SF-114-5.15/5.32 | Proposed improvements include reconstruction of Willow Road and Newbridge Street intersection,roadway widening for an additional westbound through/right-turn lane,curb reconstruction,utility relocations,traffic signal modifications,and signing and striping improvements. | Willow Road, Menlo Park | 08/22/2018 | 1 (10/27/2015) | Details CEM-3701 Report |
213473 | Project ID: 213473 Permit Numbers: 0717NMC0725 07176DP2028 0717NRW2377 07186RT0795 | 07--105-9.788/9.788 | Addition of a pedestrian crosswalk on south side of the intersection to accommodate the proposed pedestrian crosswalk. Signal modifications, activated push button installation, curb return, sidewalk and curb ramp modifications. Existing median will be adjusted to accommodate the proposed crosswal | Willowbrook Ave east, NA | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report |
209048 | Project ID: 209048 DEA: 07234004 EFIS: 0700000394 Permit Numbers: 0712NMC1924 | 07-LA-405-9.3/9.9 | Modification at I-405 ramp and Wilmington Ave. | Wilmington Ave., Carson | 08/19/2021 | 1 (11/08/2013) | Details CEM-3701 Report |
212629 | Project ID: 212629 Permit Numbers: 08166MC0489 08186RW0070 | 08-RIV-79-18.47/18.47 | Enter onto State Route 79 (SR-79) right-of-way at the intersection of Stetson Avenue in the County of Riverside to repave and widen highway with HMA overlay; install new landscape and irrigation, new signal and lighting, signage, pavement delineation, striping; construct new curb, gutters, sidewalk | Winchester Road & Stetson Avenue, Hemet | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
993142 | Project ID: 993142 Permit Numbers: 08196CD0860 08216RT0988 | 08---4.7/-1 | Enter onto State Route 79 (SR-79) right-of-way at Murrieta Hot Springs Road in the Cityof Murrieta to construct widened pavement, curb and gutter, sidewalk, curb ramp, installstreet light, restripe, modify signal, and install new landscaping/irrigation as per plansdate stamped, August 11, 2020 by t | Winchester Road, Murrieta | 1 (09/08/2021) | Details CEM-3701 Report | |
994826 | Project ID: 994826 EFIS: 0000020505 Permit Numbers: 08216MC0215 08236MC0122 | 08---15.915/15.824 | Enter onto State Route 79 (SR-79) right-of-way at Domenigoni Parkway in the County of Riverside to construct street improvements that includes a right-in/right-out access driveway, new sidewalks, street lights, and signal modifications as per plans date stamped, May 12, 2022 by the Caltrans Distric | Winchester Road, Riverside County | 1 (05/15/2023) | Details CEM-3701 Report | |
2019 | Project ID: 2019 DEA: 04219934 EFIS: 0400000636 | 04-SON-101-31.2/31.5 | 0406-6DP-1216 (Contractor's permit number); 0406-NMC-0350 (original permit issued to the town of Windsor) 0406-NRD-1253 (a rider reflecting some District directed change) | WINDSOR-ARATA LANE INTERCHANGE PROJECT PHASE 2A | 06/08/2020 | 1 (05/11/2007) | Details CEM-3701 Report |
210562 | Project ID: 210562 DEA: 031C2114 EFIS: 0314000213 | 03-SAC-5-Var | Riverfront Reconnection Project - Phase 1 | Within in the City of Sacramento | 03/23/2020 | 2 (07/15/2015) | Details CEM-3701 Report |