Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17641-17650 of 17771 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993126Project ID: 993126
DEA: 044K0404
EFIS: 0417000246
04-SM-1-31.2/32.0Mid-coast Multi-modal Trail Improvements ProjectSR 1 (PM 31.2/32.0) east of highway, from Mirada Road to Coronado Street in San Mateo County within El Granada08/30/20232 (07/12/2021)Details CEM-3701 Report
993155Project ID: 993155
DEA: 061A2204
EFIS: 0619000208
COOP: 061714
06-KER-46-30.5Lost Hills Pedestrian BridgeLost Hills, California 93249 2 (07/21/2021)Details CEM-3701 Report
993159Project ID: 993159
DEA: 08323034
EFIS: 0812000059
COOP: 081703
08-RIV-60-18.8/19.6Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configurationSR-60 & Moreno Beach Interchange 2 (07/27/2021)Details CEM-3701 Report
993186Project ID: 993186
DEA: 04264704
EFIS: 0400000740
04-SCL-101-40.0/41.5Reconstruction of the existing three-quadrant cloverleaf interchange to a Type L-9 partial cloverleaf interchangeThe Project limits are on Route US 101 at De La Cruz Blvd/Trimble Road Interchange in San Jose at Santa Clara County 2 (08/09/2021)Details CEM-3701 Report
993277Project ID: 993277
Permit Numbers: 0321AOP0525
03---0.4Modify ramps and install signal at SR-113 and Hutchison Drive interchangeHutchison Drive, Davis 2 (11/10/2021)Details CEM-3701 Report
993304Project ID: 993304
DEA: 041Q2204
EFIS: 0418000220
COOP: 042833
04-ALA-262-R0.0/R1.07Mission Blvd Cross ConnectorOn State Route 262 (Mission Boulevard) Cross Connector from I-880 to I-680 in the City of Fremont w 2 (05/09/2023)Details CEM-3701 Report
993307Project ID: 993307
Permit Numbers: 0421NDP2901
04-SCL-101-40.4/41US-101/ De La Cruz Boulevard interchange improvement.Re-construct the US 10 I /De La Cruz Boulevard/ Trimble Road Interchange to improve traffic operations and connectivity for pedestrians and bicyclists. Work includes:i) Replacement of the existing De La Cruz Boulevard bridge overcrossing with anUS 101/ De La Cruz , San Jose 2 (10/07/2024)Details CEM-3701 Report
993308Project ID: 993308
Permit Numbers: 0421NOP2843
04---40.4/41US-101/ De La Cruz Boulevard interchange improvement.US 101/ De La Cruz , San Jose 2 (10/07/2024)Details CEM-3701 Report
993349Project ID: 993349
DEA: 031J6904
EFIS: 0321000047
COOP: 030733
03-YOL-113-R8.7Sports Park Drive Pedestrian OvercrossingSR113/Sports Park Drive POC 2 (10/20/2021)Details CEM-3701 Report
993615Project ID: 993615
DEA: 022H8004
EFIS: 0217000010
COOP: 020184
02-SHA-5-R11.5/R12.8Bonnyview Interchange LCONB and SB Interstate 5 off-ramps at South Bonnyview Road 2 (03/02/2022)Details CEM-3701 Report