Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17641-17650 of 18166 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211670 | Project ID: 211670 DEA: 06434014 EFIS: 0600000967 | 06-TUL-65-R15.1/18.0 | WIDEN 2 LANES CONVENTIONAL HIGHWAY TO 4 LANES EXPRESSWAY. | TULARE COUNTY IN AND NEAR PORTERVILLE FROM 1.0 MILE NORTH OF AVENUE 112 TO 0.3 MILE SOUTH OF ROUTE 65/190 SEPARATION | 08/24/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
211496 | Project ID: 211496 DEA: 060S4804 EFIS: 0615000049 | 06-TUL-65-R9.3/14.0 | COLD PLANE, PAVE WITH RHMA-G AND MODIFY SIGNAL AND LIGHTING. | TULARE COUNTY IN AND NEAR TERRA BELLA FROM 0.7 MILE SOUTH OF AVENUE 80 TO 0.1 MILE SOUTH OF AVENUE 112 | 08/20/2018 | 1 (10/04/2016) | Details CEM-3701 Report |
994113 | Project ID: 994113 DEA: 061E6904 EFIS: 0622000084 | 06-TUL-99-9.8/40.7 | LANDSCAPE PLANTING, IRRIGATION, AND PLANT ESTABLISHMENT. | TULARE COUNTY IN AND NEAR TEVISTON AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF AVENUE 76 TO 0.1 MILE SOUTH OF BETTY DRIVE | 1 (07/14/2022) | Details CEM-3701 Report | |
214277 | Project ID: 214277 DEA: 060R1704 EFIS: 0614000051 | 06-TUL-99-28.3/31.0 | MINOR CONCRETE (EXPOSED AGGREGATE CONCRETE). | TULARE COUNTY IN AND NEAR TULARE FROM 0.3 MILE SOUTH OF BARDSLEY AVENUE OVERCROSSING TO 0.4 MILE NORTH OF PROSPERITY AVENUE OVERCROSSING | 07/15/2021 | 1 (08/05/2019) | Details CEM-3701 Report |
1000116 | Project ID: 1000116 DEA: 06360304 EFIS: 0620000127 | 06-TUL-99-30.2/35.2 | INSTALL IRRIGATION SYSTEM AND PLANTING. | TULARE COUNTY IN AND NEAR TULARE FROM 0.4 MILE SOUTH OF PROSPERITY AVENUE OVERCROSSING TO 1.2 MILES SOUTH OF AVENUE 280 OVERCROSSING | 1 (02/26/2024) | Details CEM-3701 Report | |
212599 | Project ID: 212599 DEA: 06332214 EFIS: 0616000123 | 06-TUL-99-31.2/32.5 | HIGHWAY PLANTING, IRRIGATION, AND PLANT ESTABLISHMENT. | TULARE COUNTY IN AND NEAR TULARE FROM 0.7 MILE SOUTH TO 0.6 MILE NORTH CARTMILL AVENUE OVERCROSSING | 11/23/2021 | 1 (05/07/2018) | Details CEM-3701 Report |
208842 | Project ID: 208842 DEA: 060E6704 EFIS: 0600020035 | 06-TUL-99-6.1/29.9 | PAINT BRIDGE AND CONSTRUCT SLOPE PAVING. | TULARE COUNTY IN AND NEAR TULARE FROM AVENUE 48 TO CROSS AVENUE | 10/08/2014 | NOT VERIFIED | Details CEM-3701 Report |
209349 | Project ID: 209349 DEA: 060P1704 EFIS: 0612000109 | 06-TUL-99-25.0/27.6 | REPLACE FAILED CONCRETE PANELS WITH HMA, AND PAVE WITH RHMA-SP-G. | TULARE COUNTY IN AND NEAR TULARE FROM ELK BAYOU BRIDGE TO PAIGE AVENUE OVERCROSSING | 12/14/2020 | 1 (12/24/2014) | Details CEM-3701 Report |
995239 | Project ID: 995239 DEA: 060W9104 EFIS: 0618000011 | 06-TUL-99-27.6/30.6 | HMA, RHMA-G, JOINTED PLAIN CONC PVMT (RSC) AND STBB (TYPE M). | TULARE COUNTY IN AND NEAR TULARE FROM PAIGE AVENUE OVERCROSSING TO PROSPERITY AVENUE OVERCROSSING. | 1 (10/14/2024) | Details CEM-3701 Report | |
993426 | Project ID: 993426 DEA: 061C3604 EFIS: 0621000162 | 06-TUL-63-0.0/2.0 | COLD PLANE AC, PLACE HMA (TYPE A) AND RHMA-G. | TULARE COUNTY IN AND NEAR TULARE FROM ROUTE 137 TO EAST CARTMILL AVENUE | 11/30/2022 | 1 (12/06/2021) | Details CEM-3701 Report |