Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17621-17630 of 18003 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
210132 | Project ID: 210132 DEA: 080R2504 EFIS: 0812000054 Permit Numbers: 0814AOP1112 | 08-RIV-10-155.1/156.1 | Enter onto Interstate 10 (I-10) right-of-way at Hobson Way Interchange in the City of Blythe to construct new improvements including new on and off ramps approximately 3,500 feet west of the the existing ramps and to close the existing ramps, as per plan date stamped December 3, 2014 by Caltrans Di | Hobson Way, Blythe | 07/31/2018 | 2 (09/29/2015) | Details CEM-3701 Report |
210160 | Project ID: 210160 DEA: 101E2204 EFIS: 1015000011 COOP: 10439 | 10-SJ-580-13.3/13.8 | Widen existing road under I-580 to accommodate ramp widening and additional left turn lanes . Proposes to replace existing two lane bridge over the adjacent California Aqueduct on the east side of the Interchange and add two additional lanes | Between I-580 and Old Schulte Road | 2 (01/30/2015) | Details CEM-3701 Report | |
210289 | Project ID: 210289 DEA: 080E9504 Permit Numbers: 0814NMC0370 08156DP0455 0815NRT0491 | 08-RIV-15-19.45/19.71 | Enter onto Interstate 15 right-of-way just north of Railroad Canyon Road Interchange in the City of Lake Elsinore to remove existing PCCP and AC shoulder and to construct a new southbound JPCP deceleration lane and HMA shoulder, including minor grading, drainage inlet modification, temporary water | Railroad Canyon Road, Lake Elsinore | 07/31/2018 | 2 (08/04/2015) | Details CEM-3701 Report |
210158 | Project ID: 210158 DEA: 100G4204 EFIS: 1014000038 COOP: 10437 | 10-STA-5-15.8/15.9 | Reconstruct the existing Interstate 5/Sperry Road Interchange | Stanislaus County | 2 (01/30/2015) | Details CEM-3701 Report | |
210152 | Project ID: 210152 Permit Numbers: 0813NSN0996 | 08--- | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report | ||
210155 | Project ID: 210155 DEA: 101E3904 EFIS: 1015000049 | 10-SJ-4,005-Vatr, var | Replace existing irrigation systems with RICS | At various locations | 07/28/2021 | 2 (01/30/2015) | Details CEM-3701 Report |
210164 | Project ID: 210164 DEA: 010F0704 EFIS: 0115000063 | 01-HUM-101-6.5 | Slide removal and slope stabilization | In Humboldt County near Benbow at 0.6 mile north of South Fork Eel River Bridge | 08/27/2018 | 2 (01/30/2015) | Details CEM-3701 Report |
210170 | Project ID: 210170 DEA: 010F0104 EFIS: 0115000056 | 01-HUM-299-24.1, 24.2 | Stabilize slope and reconstruct roadway | In Hum County | 08/27/2018 | 2 (01/30/2015) | Details CEM-3701 Report |
210179 | Project ID: 210179 DEA: 100Y9404 | 10-AMA-88-38.0/46.9 | RUBBERIZED-HMA RESURFACING, LOCALIZED DIGOUTS, AND DIKE REPLACEMENT. | AMADOR COUNTY ABOUT 8 MILES WEST OF PIONEER FROM 0.2 MILE WEST OF SHAKE RIDGE ROAD TO 0.9 MILE EAST OF CAT CREEK ROAD | 11/07/2016 | 2 (01/30/2015) | Details CEM-3701 Report |
210180 | Project ID: 210180 DEA: 101C9004 EFIS: 1014000185 | 10-STA-5,27-41.0/51.0 | REPAIR FAILED AREAS AND RUBBERIZED HMA RESURFACING. | STANLISLAUS COUNTY AT AND NEAR LA GRANGE FROM 2.2 MILES EAST OF TOULUMNE RESORT RIGHT TO TOULUMNE COUNTY LINE. | 11/14/2016 | 2 (01/30/2015) | Details CEM-3701 Report |