Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17591-17600 of 17771 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214568Project ID: 214568
DEA: 07353404
EFIS: 0718000289
Permit Numbers: 0719ADP1912
07-LA-72-5.243/5.3Addition of East bound and west bound through lane , east bound right turn lane and second west bound left turn lane at Philadelphia st, bike lane, new bus stop, modification to signal phasing and temporary traffic controlsCity of Whittier , Whitter Blvd, State Hwy 72, 0.1 mile North West of Sorensen Ave to 0.2 mile south east of Philadelphia St. NOT VERIFIEDDetails CEM-3701 Report
214924Project ID: 214924
DEA: 080M9004
EFIS: 0812000248
COOP: 081695
08-RIV-111-18.0/19.0The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca.The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. 2 (04/22/2020)Details CEM-3701 Report
214677Project ID: 214677
DEA: 081F2604
EFIS: 0814000194
COOP: 081696
08-SBD-60-R7.83/R7.91The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb rampsSR-60 and Archibald Avenue between East Oak Hill and Monticello Place08/19/20212 (01/30/2020)Details CEM-3701 Report
214719Project ID: 214719
DEA: 021J2501
EFIS: 0220000050
02-SIS-5-17.4/17.4001Vista Drive Oversight 12/06/20212 (03/02/2020)Details CEM-3701 Report
214818Project ID: 214818
DEA: 034H2604
EFIS: 0318000232
COOP: 030681
03-YOL-80-0.841/0.851Connect the Olive Drive Pedestrian / Bicycle Trail to the Pole Line Road Overcrossing Bridge at I-80 with new bike/ped bridge/ramp connection.Western edge of Pole Line Road to the edge of Olive Drive at the existing bike path connection PM 0.9.03/17/20222 (03/18/2021)Details CEM-3701 Report
214869Project ID: 214869
DEA: 044H1304
EFIS: 0413000094
04-SCL-101-50.7Construct a new, year-round bicycle and pedestrian overcrossing over Highway 101Adobe Creek in the City of Palo Alto.11/02/20212 (03/23/2020)Details CEM-3701 Report
214890Project ID: 214890
DEA: 080A4414
EFIS: 0818000047
COOP: 081894
08-RIV-I-15-17.6/19.6Construction consists of additional of two new lanes on Railroad Canyon Road through interchange, reconstruction of the northbound diamond ramps to hook ramps to connect to Grape Street , construction of auxiliary and deceleration lanes on I-15Located at City of Lake Elsinore , 1.6 Mile South to 0.4 Mile North of Railroad Canyon Road undercrossing in Riverside County, CA. 2 (03/26/2020)Details CEM-3701 Report
214925Project ID: 214925
DEA: 080A9004
08-RIV-111-Avenue 66 at SR-111and Union Pacific Railroad Grade Separation 08/17/2021NOT VERIFIEDDetails CEM-3701 Report
214941Project ID: 214941
DEA: 044Q4704
EFIS: 0419000401
COOP: 042752
04-SCL-SR 17-6.2/9.3SR 17 Corridor Congestion Relief  2 (03/12/2021)Details CEM-3701 Report
214953Project ID: 214953
DEA: 063HT024
EFIS: 0617000190
06-KER-VAR-The Project consists of 21 miles of trackway for the High?Speed Rail through the counties of Tulare and Kern in the vicinity of Wasco, California. It includes several grade separated crossings, a pedestrian crossing, and a non-standard structure.Counties of Tulare and Kern at SR43/SR46 2 (05/05/2020)Details CEM-3701 Report