Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17581-17590 of 17758 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214262Project ID: 214262
Permit Numbers: 0419NMC0761 0419NRT1587
04---10.8The City of Milpitas proposes to rehalabilitate three (3) road segments.McCarthy Blvd, Hillview Dr and Jacklin Rd, Milpitas 2 (08/19/2019)Details CEM-3701 Report
214369Project ID: 214369
DEA: 120R2104
EFIS: 1218000066
12-ORA-5,91,241,261,133-Signage Enhancement Project  2 (02/22/2021)Details CEM-3701 Report
214482Project ID: 214482
DEA: 10403503
EFIS: 1000000424
COOP: 104075
10-STA-132-R11.3/R14.7SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti.freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing03/04/20222 (10/14/2019)Details CEM-3701 Report
214559Project ID: 214559
DEA: 05111914
05-SBT-80-Salesforce Transit Center  NOT VERIFIEDDetails CEM-3701 Report
214577Project ID: 214577
DEA: 11430044
EFIS: 1117000131
COOP: 118440
11-SD-67-2.64he State Route 67 (SR-67) and Woodside Avenue Improvements Project (Project) is located within Santee, California in San Diego County. The City of Santee (City) in cooperation with the California Department of Transportation (Caltrans) will modify the existing intersection at the southbound SR-67 ofThe project encompasses limits from Station "FR-5A" 166+56 (PM 2.64) to Station "NW-WOOD A" 179+51 (PM 2.78) along Woodside Avenue to State Route 67, and from Station "FR-5A" 171+86 to Station "WD-1A" 175+45 along N Woodside Avenue to Woodside Avenue. 2 (12/09/2019)Details CEM-3701 Report
214568Project ID: 214568
DEA: 07353404
EFIS: 0718000289
Permit Numbers: 0719ADP1912
07-LA-72-5.243/5.3Addition of East bound and west bound through lane , east bound right turn lane and second west bound left turn lane at Philadelphia st, bike lane, new bus stop, modification to signal phasing and temporary traffic controlsCity of Whittier , Whitter Blvd, State Hwy 72, 0.1 mile North West of Sorensen Ave to 0.2 mile south east of Philadelphia St. NOT VERIFIEDDetails CEM-3701 Report
214924Project ID: 214924
DEA: 080M9004
EFIS: 0812000248
COOP: 081695
08-RIV-111-18.0/19.0The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca.The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. 2 (04/22/2020)Details CEM-3701 Report
214677Project ID: 214677
DEA: 081F2604
EFIS: 0814000194
COOP: 081696
08-SBD-60-R7.83/R7.91The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb rampsSR-60 and Archibald Avenue between East Oak Hill and Monticello Place08/19/20212 (01/30/2020)Details CEM-3701 Report
214719Project ID: 214719
DEA: 021J2501
EFIS: 0220000050
02-SIS-5-17.4/17.4001Vista Drive Oversight 12/06/20212 (03/02/2020)Details CEM-3701 Report
214818Project ID: 214818
DEA: 034H2604
EFIS: 0318000232
COOP: 030681
03-YOL-80-0.841/0.851Connect the Olive Drive Pedestrian / Bicycle Trail to the Pole Line Road Overcrossing Bridge at I-80 with new bike/ped bridge/ramp connection.Western edge of Pole Line Road to the edge of Olive Drive at the existing bike path connection PM 0.9.03/17/20222 (03/18/2021)Details CEM-3701 Report