Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17581-17590 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214262 | Project ID: 214262 Permit Numbers: 0419NMC0761 0419NRT1587 | 04---10.8 | The City of Milpitas proposes to rehalabilitate three (3) road segments. | McCarthy Blvd, Hillview Dr and Jacklin Rd, Milpitas | 2 (08/19/2019) | Details CEM-3701 Report | |
214369 | Project ID: 214369 DEA: 120R2104 EFIS: 1218000066 | 12-ORA-5,91,241,261,133- | Signage Enhancement Project | 2 (02/22/2021) | Details CEM-3701 Report | ||
214482 | Project ID: 214482 DEA: 10403503 EFIS: 1000000424 COOP: 104075 | 10-STA-132-R11.3/R14.7 | SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti. | freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing | 03/04/2022 | 2 (10/14/2019) | Details CEM-3701 Report |
214559 | Project ID: 214559 DEA: 05111914 | 05-SBT-80- | Salesforce Transit Center | NOT VERIFIED | Details CEM-3701 Report | ||
214577 | Project ID: 214577 DEA: 11430044 EFIS: 1117000131 COOP: 118440 | 11-SD-67-2.64 | he State Route 67 (SR-67) and Woodside Avenue Improvements Project (Project) is located within Santee, California in San Diego County. The City of Santee (City) in cooperation with the California Department of Transportation (Caltrans) will modify the existing intersection at the southbound SR-67 of | The project encompasses limits from Station "FR-5A" 166+56 (PM 2.64) to Station "NW-WOOD A" 179+51 (PM 2.78) along Woodside Avenue to State Route 67, and from Station "FR-5A" 171+86 to Station "WD-1A" 175+45 along N Woodside Avenue to Woodside Avenue. | 2 (12/09/2019) | Details CEM-3701 Report | |
214568 | Project ID: 214568 DEA: 07353404 EFIS: 0718000289 Permit Numbers: 0719ADP1912 | 07-LA-72-5.243/5.3 | Addition of East bound and west bound through lane , east bound right turn lane and second west bound left turn lane at Philadelphia st, bike lane, new bus stop, modification to signal phasing and temporary traffic controls | City of Whittier , Whitter Blvd, State Hwy 72, 0.1 mile North West of Sorensen Ave to 0.2 mile south east of Philadelphia St. | NOT VERIFIED | Details CEM-3701 Report | |
214924 | Project ID: 214924 DEA: 080M9004 EFIS: 0812000248 COOP: 081695 | 08-RIV-111-18.0/19.0 | The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca. | The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. | 2 (04/22/2020) | Details CEM-3701 Report | |
214677 | Project ID: 214677 DEA: 081F2604 EFIS: 0814000194 COOP: 081696 | 08-SBD-60-R7.83/R7.91 | The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb ramps | SR-60 and Archibald Avenue between East Oak Hill and Monticello Place | 08/19/2021 | 2 (01/30/2020) | Details CEM-3701 Report |
214719 | Project ID: 214719 DEA: 021J2501 EFIS: 0220000050 | 02-SIS-5-17.4/17.4001 | Vista Drive Oversight | 12/06/2021 | 2 (03/02/2020) | Details CEM-3701 Report | |
214818 | Project ID: 214818 DEA: 034H2604 EFIS: 0318000232 COOP: 030681 | 03-YOL-80-0.841/0.851 | Connect the Olive Drive Pedestrian / Bicycle Trail to the Pole Line Road Overcrossing Bridge at I-80 with new bike/ped bridge/ramp connection. | Western edge of Pole Line Road to the edge of Olive Drive at the existing bike path connection PM 0.9. | 03/17/2022 | 2 (03/18/2021) | Details CEM-3701 Report |