Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17531-17540 of 17703 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214289Project ID: 214289
EFIS: 0000001157
Permit Numbers: 0514NMC0478 0519NRT0383 0519NRT0001 0519NRD0572
05---6.9Reference Permit #0514-NMC-0478 on all correspondence. Note #0519-NRT-0383 is just a time extension for the original permit. Work Desc: Widen Blosser Road to provide a right turn lane for the northbound approach to West Main Street (State Route 166).W. Main Street (Hwy 166), Santa Maria08/23/20211 (08/07/2019)Details CEM-3701 Report
215816Project ID: 215816
EFIS: 0000020505
Permit Numbers: 0720NSN2901 0721NRW1599
07-LA-134-2.93Modifying traffic signal; within State right of way, at the intersection of West Riverside Drive & South Buena Vista Street in the vicinity of CA-134 Freeway right of way of On and Off Ramps West Bound; in the city of Burbank; all in accordance with the current State specifications and standarW. Riverside Dr., Burbank10/06/20221 (06/29/2021)Details CEM-3701 Report
215100Project ID: 215100
DEA: 071XP904
EFIS: 0720000158
07-LA-118-R5.75, R5.75/R5.75, 5.75/5.75REPAIR FAILED DRAINAGE SYSTEM ON LA COUNTY W/B LA-118 RESEDA BLVDW/B LA-118 RESEDA BLVD10/02/20231 (06/30/2021)Details CEM-3701 Report
1637Project ID: 1637
DEA: 040AA104
EFIS: 0400020172
MINOR: 04A3451
04-CC-5745-Install power generation system using photovoltaic panelsWalnut Creek East Maintenance Station 1 (12/09/2019)Details CEM-3701 Report
993475Project ID: 993475
Permit Numbers: 0320NSN1372 0321NRT1538
03---8.433/8.622Citywide Systemic Safety Improvements ProjectWalnut St., Chico 1 (03/24/2022)Details CEM-3701 Report
7598Project ID: 7598
DEA: 042332C4
EFIS: 0400000668
COOP: 042346
Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731
04-ALA-262-0/0.5Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges;Warm Springs Blvd, Fremont06/03/20151 (12/12/2012)Details CEM-3701 Report
1531Project ID: 1531
EFIS: 0000001155
Permit Numbers: 0407NMC0122 04096DP0643 0409NRD0771
04-ALA-880-0/20.621Remove and replace top 40 inches of asphalt concrete in the existing roadway of Washington Ave.Washington Ave. on ramp to I-880, San Leandro04/29/2011NOT VERIFIEDDetails CEM-3701 Report
213771Project ID: 213771
DEA: 081K3404
EFIS: 0819000023
08-SBD-215-Repair BridgeWashington Street OC 1 (11/21/2018)Details CEM-3701 Report
210752Project ID: 210752
DEA: 051G7904
05-SB-101,154-10.8/22.5,R22.5,R31.3/R32.3, VAR Water Conservation measures- upgrade irrigation systems with " Smart " irrigation technology to maximie water conservation at various locations in Santa Barbara and Goleta08/22/2018NOT VERIFIEDDetails CEM-3701 Report
995087Project ID: 995087
DEA: 051P5904
EFIS: 0522000086
05-SCR-1-0.0/5.0Cold plane, RHMA-GWatsonville area, County line to Scenic pullout08/13/20241 (08/21/2023)Details CEM-3701 Report