Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17511-17520 of 17703 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213861 | Project ID: 213861 DEA: 041J9804 EFIS: 0414000405 | 04-SCL-280- | Improvement work to the I-280 Calvert Drive on-ramp. | I-280 and Calvert Drive | 06/08/2020 | 2 (01/11/2019) | Details CEM-3701 Report |
213881 | Project ID: 213881 DEA: 044J3304 EFIS: 0415000324 | 04-SCL-280- | SCL-280- Lawrence Off-Ramp_Apple Project | SCL-280- Lawrence Off-Ramp_Apple Project | 07/17/2019 | 2 (01/16/2019) | Details CEM-3701 Report |
213899 | Project ID: 213899 DEA: 120N8404 EFIS: 1214000115 | 12--- | 08/25/2021 | 2 (07/02/2019) | Details CEM-3701 Report | ||
213907 | Project ID: 213907 DEA: 034H1704 EFIS: 0318000199 COOP: 030650 | 03-PLA-80,174-33.0/33.1 | In Colfax, at the I-80 westbound onramps and offramps to SR 174 (PM 33.0/33.1) - Install roundabout. Two Type 15 pole and luminaires in Caltrans Right of Way. | City of Colfax S. Auburn Street and WB I-80 On-Off-Ramp Roundabout Project | 02/10/2021 | 2 (02/19/2019) | Details CEM-3701 Report |
213908 | Project ID: 213908 DEA: 034F5104 EFIS: 0314000174 COOP: 030678 | 03-SAC-50-10.9/11.1 | Widen Zinfandel Drive, west side on southbound traffic, by adding a precast girder structure (12') and modify existing traffic control electrical systems at Zinfandel Dr. and White Rock Rd, US 50 westbound off ramp to Zinfandel Dr. | Agency is City of Rancho Cordova, US 50 and Zinfandel Drive, Sacramento | 07/26/2021 | 2 (08/20/2019) | Details CEM-3701 Report |
213917 | Project ID: 213917 DEA: 030E9604 EFIS: 0300000061 COOP: 030525 | 03-ED-49-11.78/12.4 | Realignment / widening SR 49, includes HMA paving, concrete curb, gutter, and sidewalk, signing and striping, permanent and temporary fence removal and construction, drainage improvements, signal and lighting modifications, retaining wall, and utilities | Local Agency: El Dorado County. El Dorado County along Highway 49 in the community of Diamond Springs, approximately 3 miles south of the City of Placerville | 02/03/2021 | 2 (02/04/2019) | Details CEM-3701 Report |
213918 | Project ID: 213918 DEA: 063HT014 EFIS: 0615000116 | 06--- | (Alternative Delivery) | 2 (02/04/2019) | Details CEM-3701 Report | ||
213919 | Project ID: 213919 DEA: 100P2004 EFIS: 1000000182 COOP: 100487 Permit Numbers: 1019NMC0209 | 10-SJ-120-R3.4 to PM R5.2 | SR 120 / Union Road Interchange. Construction of 4 new bridges and widening 47 feet of the overcrossing, reconstruction of all the ramps, auxiliary lanes on both sides of SR 120, Overhead sign and new traffic signals and lighting. | SR 120 from Airport Way to Union Road and from Union Road to Main Street | 08/04/2021 | 2 (07/31/2019) | Details CEM-3701 Report |
213956 | Project ID: 213956 DEA: 03425504 EFIS: 0300000617 COOP: 030635 | 03-SAC-5-31.1/31.9 | Piles, CIP P/S Concrete Box Girder, Overhead sign structures; est const start: June 2019, Est comp: July 2020. | Local Agency: County of Sacramento; On Interstate 5, from Route 5/70 /99 Separation to Powerline Road Overcrossing. | 07/30/2021 | 2 (02/20/2019) | Details CEM-3701 Report |
213959 | Project ID: 213959 DEA: 100T9104 EFIS: 1000000306 COOP: 10345,10446 | 10-STA-99-R4.1/F4.9 | Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20 | State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing. | 07/23/2021 | 2 (02/21/2019) | Details CEM-3701 Report |