Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17401-17410 of 18023 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
3568 | Project ID: 3568 EFIS: 0000001155 Permit Numbers: 0705NSN1425 | 07-LA-72-.53 | WHITTER BOULEVARD @ FIRST ST. UPGRADE TRAFFIC SIGNAL | 03/25/2013 | 1 (03/25/2013) | Details CEM-3701 Report | |
213761 | Project ID: 213761 DEA: 030H5804 EFIS: 0315000211 | 03-SAC-50-R3.5 | WIDEN & SIGNALIZE INTERSECTION, REALIGN RAMP, ADA FACILITIES | SACRAMENTO COUNTY IN SACRAMENTO AT HORNET DRIVE EASTBOUND OFF-RAMP | 12/13/2021 | 1 (01/08/2019) | Details CEM-3701 Report |
731 | Project ID: 731 Permit Numbers: 03046MC0352 | 03-PLA-65-13.2/13.46 | widen & channelize Highway | N/A, N/A | 09/16/2014 | NOT VERIFIED | Details CEM-3701 Report |
4556 | Project ID: 4556 EFIS: 0000001155 Permit Numbers: 08046CD0889 | 08-RIV-74-44.4 | WIDEN 14â ² RIGTH TURN LANE,MODIFY EXISTING DRIVEWAY,CONSTRUCT MEDIAN MODIFY SIGNAL | 07/06/2006 | 2 (07/06/2006) | Details CEM-3701 Report | |
211670 | Project ID: 211670 DEA: 06434014 EFIS: 0600000967 | 06-TUL-65-R15.1/18.0 | WIDEN 2 LANES CONVENTIONAL HIGHWAY TO 4 LANES EXPRESSWAY. | TULARE COUNTY IN AND NEAR PORTERVILLE FROM 1.0 MILE NORTH OF AVENUE 112 TO 0.3 MILE SOUTH OF ROUTE 65/190 SEPARATION | 08/24/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
5347 | Project ID: 5347 DEA: 092144U4 | 09-INY-395-R104.6/122.5 | WIDEN 4 LANE EXPRESSWAY | Inyo County in and near Independence from 1.2 KM South of the Los Angeles Aqueduct Bridge to 1.0 KM North of Shabbell Lane | 06/13/2011 | 1 (06/17/2009) | Details CEM-3701 Report |
3395 | Project ID: 3395 DEA: 06324504 EFIS: 0600000366 | 06-TUL,FRE-99-41.3/R53.9,R0.0/R1.2 | WIDEN 4 LANES TO 6 LANES. | TULARE AND FRESNO COUNTIES IN AND NEAR KINGSBURG FROM 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD TO 0.2 MILE NORTH OF ROUTE 99/201 CONEJO AVENUE SEPARATION | 02/16/2021 | 1 (04/11/2012) | Details CEM-3701 Report |
215229 | Project ID: 215229 EFIS: 0000020505 Permit Numbers: 1213NMC0661 1217NRT0640 1218NRT0934 1219NRD0737 1219NRW0828 1220NRT0038 1220NRT0039 1220NRD0246 12206RW0407 1221NRT0042 | 12---20.9 | WIDEN A DEDICATED RIGHT TURN POCKET FROM WESTBOUND WHITTIER BLVD TO NORTHBOUND HACIENDA ROAD. ADD A SECOND RIGHT TURN LANE FROM SOUTHBOUND HACIENDA ROAD TO WESTBOUND WHITTIER BLVD. AND ADD A DEDICATED LEFT TURN LANE FROM SOUTHBOUND HACIENDA ROAD TO EASTBOUND WHITTIER BLVD. Included in this permit | BEACH BLVD., LA HABRA | 1 (03/18/2020) | Details CEM-3701 Report | |
215547 | Project ID: 215547 DEA: 051J0004 EFIS: 0517000049 Permit Numbers: 0520NOP0841 0521NRD0267 | 05---4.7/4.9 | WIDEN A PORTION OF THE NB OFF-RAMP AT TEFFT STREET TO A THIRD 12-FOOT LANE (RIGHT TURN ONLY LANE), PROVIDE MINIMUM 2-FOOT LEFT SHOULDER, CONSTRUCT A RETAINING WALL ALONG A PORTION OF THE RIGHT SHOULDER, INSTALL A NEW LIGHT, UPGRADE THE EXISTING GUARDRAIL TO MGS, AND CONSTRUCT A NEW ADA CURB RAMP A | NB AND SB OFFRAMPS, NIPOMO | 08/17/2022 | 1 (03/12/2021) | Details CEM-3701 Report |
5960 | Project ID: 5960 Permit Numbers: 11076MC0134 | 11-SD-78-31.74/31.93 | WIDEN AND ADD A WESTBOUND LEFT TURN LANE | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |