Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17021-17030 of 17622 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
605 | Project ID: 605 DEA: 02383014 | 02-SHA-44-R38.9/R40.6 | WIDEN AND REALIGN EXISTING ROADWAY WITH ASPHALT CONCRETE | 03/11/2011 | NOT VERIFIED | Details CEM-3701 Report | |
7427 | Project ID: 7427 DEA: 07215934 EFIS: 0700001833 | 07-LA-5-2.4/4.0 | Widen and Realign Freeway and Construct Ped OC, OC and UC Structures. | LOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM 0.1 MILE NORTH OF CARMENITA ROAD OVERCROSSING TO 0.1 MILE NORTH OF SILVERBOW AVENUE PEDESTRIAN OVERCROSSING | 02/20/2020 | 1 (11/26/2012) | Details CEM-3701 Report |
3958 | Project ID: 3958 DEA: 07215914 EFIS: 0700001831 | 07-LA-5-1.2/2.1 | WIDEN AND REALIGN FREEWAY AND RECONSTRUCT OVERCROSSING STRUCTURE. | LOS ANGELES COUNTY IN SANTA FE SPRINGS FROM 0.3 MILE SOUTH OF NORTH FORK COYOTE CREEK BRIDGE TO 0.3 MILE NORTH OF MARQUARDT AVENUE AND AT NORWALK HUB AND LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER | 06/14/2016 | 1 (05/01/2012) | Details CEM-3701 Report |
6817 | Project ID: 6817 DEA: 121072U4 EFIS: 1200000400 | 12-ORA-133- 4.2 | WIDEN AND REALIGN HIGHWAY | IN ORANGE COUNTY IN LAGUNA BEACHAND IRVINE FROM ROUTE 73 AND 133SEPARATION TO 0.5 KM SOUTH OF ROUTE 403 AND 133 SEPARATION | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
209848 | Project ID: 209848 DEA: 11297604 EFIS: 1100000410 | 11-SD-5-R10.7 | Widen and realign I-5 northbound on-ramp. Add turn lanes on Civic Center Drive and signalize within project limits. And add left-turn pockets for eastbound/westbound Civic Center. | In San Diego at Civic Center Drive and the Wilson Avenue/I-5 northbound onramp. Add signalization; add northbound lane on Wilson Avenue; widen northbound I-5 onramp; lengthen left-turn pocket from westbound Civic Center to Southbound I-5 | 08/17/2021 | NOT VERIFIED | Details CEM-3701 Report |
3666 | Project ID: 3666 EFIS: 0000001155 Permit Numbers: 0708NMC1784 | 07-VEN-34-12.73/13.54 | Widen and realign Lewis Road and construct new structure over RR. | Pleasant Valley Rd. to Ventura Rd., Camarillo | 07/31/2018 | 1 (01/30/2013) | Details CEM-3701 Report |
3832 | Project ID: 3832 DEA: 071660U4 | 07-LA-1-27.4 | WIDEN AND REALIGN ROADWAY- LINCOLN BLVD | IN LOS ANGELES COUNTY INLOS ANGELES AT VARIOUS LOCATIONS | 12/09/2010 | 1 (12/09/2010) | Details CEM-3701 Report |
1098 | Project ID: 1098 DEA: 033864U4 | 03-SUT,YUB-70-0.2/13.4,0.0/2.5 | WIDEN AND REALIGN ROADWAY- RTE 70/99 SEPARATION | 08/22/2011 | 1 (08/22/2011) | Details CEM-3701 Report | |
1459 | Project ID: 1459 EFIS: 0000001155 Permit Numbers: 04066DP2065 | 04-CC-4-31.8 | WIDEN AND REALIGN ROADWAY; CONSTRUCT CURB, GUTTER AND SIDEWALK | 05/03/2011 | NOT VERIFIED | Details CEM-3701 Report | |
1367 | Project ID: 1367 EFIS: 0000001155 Permit Numbers: 0403NSN0909 0407NRW0636 | 04-CC-4-31.8 | WIDEN AND REALIGN ROADWAY;INSTALL CURB GUTTER,TRAFFIC SIGNAL SYSTEM | 05/03/2011 | NOT VERIFIED | Details CEM-3701 Report |