Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16331-16340 of 17771 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
994832Project ID: 994832
DEA: 061G0204
EFIS: 0623000180
06-KER-58-0/6  05/22/20231 (05/22/2023)Details CEM-3701 Report
994841Project ID: 994841
DEA: 043Y3004
EFIS: 0423000219
04-SCL-130-9.8, 9.800000000000001/9.800000000000001To stabilize the slope with the use of a Soldier Steel Pile Wall and a CIDH Pile System, as well as the installation of a drainage corrugated steel pipe.In Santa Clara County on Highway 130 - PM 9.810/09/20241 (08/07/2023)Details CEM-3701 Report
994833Project ID: 994833
DEA: 010L4604
EFIS: 0122000013
01-DN,MEN-20,101-VarMODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS.DEL NORTE AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS 1 (05/22/2023)Details CEM-3701 Report
994834Project ID: 994834
DEA: 010L4804
EFIS: 0122000021
01-MEN-162-28.6/29.4RUBBERIZED SPEED HUMP, SOLAR LIGHTING ASSEMBLY SYSTEM, MINOR CONCRETEMENDOCINO COUNTY NEAR COVELO FROM 0.1 MILE WEST OF TOWN CREEK BRIDGE TO 0.1 MILE EAST OF EAST LANE ROAD06/11/20241 (09/12/2023)Details CEM-3701 Report
994835Project ID: 994835
DEA: 032J9104
EFIS: 0322000136
03-NEV-80-25.5/27.3POLYESTER CONC, REPLACE JOINT SEAL (ASPHALT RUBBER), CONCRETE BARRIER.NEVADA COUNTY NEAR FLORISTON FROM 1.9 MILES EAST OF HINTON ROAD TO TRUCKEE RIVER BRIDGE 1 (05/22/2023)Details CEM-3701 Report
994836Project ID: 994836
DEA: 032J9504
EFIS: 0322000142
03-COL-20-R0.6/R1.2,3.4HMA (TYPE A), HIGH FRICTION SURFACE TREATMENT, & STBB.COLUSA COUNTY ABOUT 20 MILES WEST OF WILLIAMS FROM 0.6 MILE EAST TO 1.2 MILES EAST OF LAKE COUNTY LINE AND AT ROUTE 16 1 (05/22/2023)Details CEM-3701 Report
994837Project ID: 994837
DEA: 042W0404
EFIS: 0421000130
04-SON-116-36.4/39.3REPLACE ASPHALT CONCRETE SURFACING AND STRIPPING.SONOMA COUNTY IN AND NEAR PETALUMA FROM FRATE ROAD TO STAGE GULCH CREEK BRIDGE08/19/20241 (08/28/2023)Details CEM-3701 Report
994838Project ID: 994838
DEA: 061A6904
EFIS: 0620000116
06-KER,-5-49.7/52.1CONSTRUCT HIGH-TENSION MEDIAN CABLE BARRIER WITH VEGETATION CONTROL.KERN COUNTY NEAR BUTTONWILLOW FROM 2.1 MILES NORTH OF STOCKDALE HIGHWAY OVERCROSSING TO ROUTE 5/58 SEPARATION05/17/20241 (05/22/2023)Details CEM-3701 Report
994839Project ID: 994839
DEA: 061E6604
EFIS: 0622000079
06-FRE-145-33.1PLACE ROCK BLANKET, CONCRETE TEXTURE PAVING AND MONUMENT SIGNS.FRESNO COUNTY NEAR KERMAN AT JENSEN AVENUE05/23/20241 (05/22/2023)Details CEM-3701 Report
994840Project ID: 994840
DEA: 09393504
EFIS: 0922000032
09-INY,KER,MNO,SBD-6,14,58,89,108,etc.-VarINSTALL CURVE WARNING SIGNS.INYO, KERN, MONO AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS10/22/20241 (08/02/2023)Details CEM-3701 Report