Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16081-16090 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994605 | Project ID: 994605 DEA: 101N5104 EFIS: 1021000203 | 10-SJ-5-R23.9 | REPLACE JOINT SEALS AND PLACE POLYESTER CONCRETE OVERLAY ON BRIDGE. | SAN JOAQUIN COUNTY IN STOCKTON AT WALKER SLOUGH BRIDGE | 1 (04/18/2023) | Details CEM-3701 Report | |
994606 | Project ID: 994606 DEA: 101N5204 EFIS: 1021000204 | 10-SJ-5,99,132-Var | REPAIR APPROACH SLAB AND PLACE POLYESTER CONCRETE OVERLAY ON DECK. | SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS | 1 (05/09/2023) | Details CEM-3701 Report | |
994607 | Project ID: 994607 DEA: 101N5504 EFIS: 1022000004 | 10-SJ-5-R13.0,R13.9 | REPLACE JOINT SEALS AND PLACE POLYESTER CONCRETE OVERLAY. | SAN JOAQUIN COUNTY NEAR LATHROP AT PARADISE CUT BRIDGE AND AT PARADISE CUT OVERFLOW BRIDGE | 1 (04/18/2023) | Details CEM-3701 Report | |
994608 | Project ID: 994608 DEA: 112N1094 EFIS: 1121000058 | 11-SD-8-R29.2/R43.1 | POLYESTER CONCRETE OVERLAY, METHACRYLATE, & JOINT SEALS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM WEST VICTORIA DRIVE OVERCROSSING TO CORTE MADERA ROAD UNDERCROSSING | 06/11/2024 | 1 (07/10/2023) | Details CEM-3701 Report |
994609 | Project ID: 994609 DEA: 112N1194 EFIS: 1121000148 | 11-SD-94-14.9/29.2 | MICROSURFACING, RUMBLE STRIP, PAVEMENT MARKING, & SHOULDER BACKING. | SAN DIEGO COUNTY NEAR JAMUL FROM JUNCTION ROUTE 54/94 TO 0.7 MILE EAST OF DULZURA CREEK | 1 (08/23/2023) | Details CEM-3701 Report | |
994610 | Project ID: 994610 DEA: 112N1204 EFIS: 1121000149 | 11-SD-8,15,67-VARIOUS | MICRO-SURFACING, COLD PLANE, OVERLAY, STRIPING, & SHOULDER BACKING. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 1 (07/18/2023) | Details CEM-3701 Report | |
994611 | Project ID: 994611 DEA: 112N1214 EFIS: 1121000171 | 11-SD-94-39.0/R49.9 | MICROSURFACING, SHOULDER BACKING, RUMBLE STRIP, & STRIPING. | SAN DIEGO NEAR POTRERO AND CANYON CITY FROM JUNCTION ROUTE 188 TO 3 MILES EAST OF CAMPO CREEK BRIDGE (BR NO. 57-0118) | 06/11/2024 | 1 (07/18/2023) | Details CEM-3701 Report |
994612 | Project ID: 994612 DEA: 112N1414 EFIS: 1121000253 | 11-SD-15,78-Various | PLACE METHACRYLATE, POLYESTER CONCRETE, JOINT SEALS AND REPAIR SPALLS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 1 (08/22/2023) | Details CEM-3701 Report | |
994613 | Project ID: 994613 DEA: 112N1444 EFIS: 1122000009 | 11-SD-52,125,805-VAR | POLYESTER CONCRETE OVERLAY, METHACRYLATE, & JOINT SEALS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 08/01/2024 | 1 (07/18/2023) | Details CEM-3701 Report |
994614 | Project ID: 994614 DEA: 112N1624 EFIS: 1122000133 | 11-IMP,SD-7,15,52,56,67,etc.-Var | PAVEMENT DELINEATION AND MARKING. | IMPERIAL AND SAN DIEGO COUNTIES AT VARIOUS LOCATIONS | 06/11/2024 | 1 (11/30/2023) | Details CEM-3701 Report |