Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16011-16020 of 16959 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209695Project ID: 209695
DEA: 08347704
EFIS: 0800000616
08-SBD-SR-58-0/12.9(Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395.SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395.01/14/20211 (12/01/2017)Details CEM-3701 Report
993159Project ID: 993159
DEA: 08323034
EFIS: 0812000059
COOP: 081703
08-RIV-60-18.8/19.6Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configurationSR-60 & Moreno Beach Interchange 2 (07/27/2021)Details CEM-3701 Report
214677Project ID: 214677
DEA: 081F2604
EFIS: 0814000194
COOP: 081696
08-SBD-60-R7.83/R7.91The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb rampsSR-60 and Archibald Avenue between East Oak Hill and Monticello Place08/19/20212 (01/30/2020)Details CEM-3701 Report
5170Project ID: 5170
EFIS: 0000001155
Permit Numbers: 08106MC0241
08-RIV-60-21.33/21.44Enter onto State Route 60 right-of-way at Theodore Street Interchange in City of Moreno Valley, within Riverside County, to construct roadway and truck-turning movement improvement, as per plans date stamped April 13, 2011 by the Department of TransportationSR-60 at Theodore Street, Moreno Valley06/08/2012NOT VERIFIEDDetails CEM-3701 Report
213713Project ID: 213713
Permit Numbers: 08176CD1113 08196RT0432 08196RT0873 08196RT1409 08206RT0042
08---18.614Enter onto SR-62 right-of-way at Sunburst Street in the City of Joshua Tree, to construct a the street improvements including approximately 304 LF of full pavement section widening, addition of 8" curb and gutter, sidewalk, signal modification and MBTA Bus Stop along the north side of SR-62 adjSR-62 @ Sunburst Street, Joshua Tree06/23/20211 (10/31/2019)Details CEM-3701 Report
210167Project ID: 210167
Permit Numbers: 0814NSN0524
08-SBD-62-30.7/30.7Enter onto the State Right of Way at State Route 62 (SR-62) and Encelia Avenue, in the City of Twentynine Palms, to install a traffic signal and ADA ramps as per plans date stamped by January 8, 2015 by Caltrans Encroachment Permit Office, and/or as directed by the Department Representative.NotwithSR-62, Twentynine Palms07/31/20181 (02/03/2015)Details CEM-3701 Report
214496Project ID: 214496
Permit Numbers: 0816NMC0420 0818NRT1085 0819NRD0252 0819NRW0867 0819NRT1328
08---30.5/31.3Enter onto State Route 62 (SR-62) right-of-way at Encelia Avenue to Larrea Avenue in the City of Twentynine Palms to install curb, gutter, and sidewalk along the south side of SR-62, striping removal and replacement in the vicinity of Lupine Avenue to reassign space over the existing culvert to allSR-62, Twentynine Palms06/23/20211 (06/23/2021)Details CEM-3701 Report
213625Project ID: 213625
DEA: 11428504
EFIS: 1117000090
COOP: 118435
Permit Numbers: 11176DP0844
11-SD-75-12.65-13.15The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53SR-75 and Hooper Boulevard Intersection 2 (09/12/2018)Details CEM-3701 Report
5122Project ID: 5122
DEA: 080N3204
EFIS: 0800000524
Permit Numbers: 0810NMC0412
08-RIV--12.2/12.9Auxilliary LaneSR-91 La Sierra Ave to Tyler St.08/09/2012NOT VERIFIEDDetails CEM-3701 Report
6472Project ID: 6472
DEA: 120K9904
EFIS: 1200000378
Permit Numbers: 1209NMC0164 12116DP0260
12-ORA-91-2.62/2.8add a second 12-foot wide mixed flow lane to the eastbound (EB) SR-91 diamond entrance ramp from the northbound (NB) SR-39 (Beach Blvd.) the City of Buena Park. See attached page 1A for the detailed description of work. All performed work shall be in accordanceSR-91, Buena park12/31/2011NOT VERIFIEDDetails CEM-3701 Report