Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16011-16020 of 16959 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
209695 | Project ID: 209695 DEA: 08347704 EFIS: 0800000616 | 08-SBD-SR-58-0/12.9 | (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395. | SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395. | 01/14/2021 | 1 (12/01/2017) | Details CEM-3701 Report |
993159 | Project ID: 993159 DEA: 08323034 EFIS: 0812000059 COOP: 081703 | 08-RIV-60-18.8/19.6 | Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configuration | SR-60 & Moreno Beach Interchange | 2 (07/27/2021) | Details CEM-3701 Report | |
214677 | Project ID: 214677 DEA: 081F2604 EFIS: 0814000194 COOP: 081696 | 08-SBD-60-R7.83/R7.91 | The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb ramps | SR-60 and Archibald Avenue between East Oak Hill and Monticello Place | 08/19/2021 | 2 (01/30/2020) | Details CEM-3701 Report |
5170 | Project ID: 5170 EFIS: 0000001155 Permit Numbers: 08106MC0241 | 08-RIV-60-21.33/21.44 | Enter onto State Route 60 right-of-way at Theodore Street Interchange in City of Moreno Valley, within Riverside County, to construct roadway and truck-turning movement improvement, as per plans date stamped April 13, 2011 by the Department of Transportation | SR-60 at Theodore Street, Moreno Valley | 06/08/2012 | NOT VERIFIED | Details CEM-3701 Report |
213713 | Project ID: 213713 Permit Numbers: 08176CD1113 08196RT0432 08196RT0873 08196RT1409 08206RT0042 | 08---18.614 | Enter onto SR-62 right-of-way at Sunburst Street in the City of Joshua Tree, to construct a the street improvements including approximately 304 LF of full pavement section widening, addition of 8" curb and gutter, sidewalk, signal modification and MBTA Bus Stop along the north side of SR-62 adj | SR-62 @ Sunburst Street, Joshua Tree | 06/23/2021 | 1 (10/31/2019) | Details CEM-3701 Report |
210167 | Project ID: 210167 Permit Numbers: 0814NSN0524 | 08-SBD-62-30.7/30.7 | Enter onto the State Right of Way at State Route 62 (SR-62) and Encelia Avenue, in the City of Twentynine Palms, to install a traffic signal and ADA ramps as per plans date stamped by January 8, 2015 by Caltrans Encroachment Permit Office, and/or as directed by the Department Representative.Notwith | SR-62, Twentynine Palms | 07/31/2018 | 1 (02/03/2015) | Details CEM-3701 Report |
214496 | Project ID: 214496 Permit Numbers: 0816NMC0420 0818NRT1085 0819NRD0252 0819NRW0867 0819NRT1328 | 08---30.5/31.3 | Enter onto State Route 62 (SR-62) right-of-way at Encelia Avenue to Larrea Avenue in the City of Twentynine Palms to install curb, gutter, and sidewalk along the south side of SR-62, striping removal and replacement in the vicinity of Lupine Avenue to reassign space over the existing culvert to all | SR-62, Twentynine Palms | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
213625 | Project ID: 213625 DEA: 11428504 EFIS: 1117000090 COOP: 118435 Permit Numbers: 11176DP0844 | 11-SD-75-12.65-13.15 | The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53 | SR-75 and Hooper Boulevard Intersection | 2 (09/12/2018) | Details CEM-3701 Report | |
5122 | Project ID: 5122 DEA: 080N3204 EFIS: 0800000524 Permit Numbers: 0810NMC0412 | 08-RIV--12.2/12.9 | Auxilliary Lane | SR-91 La Sierra Ave to Tyler St. | 08/09/2012 | NOT VERIFIED | Details CEM-3701 Report |
6472 | Project ID: 6472 DEA: 120K9904 EFIS: 1200000378 Permit Numbers: 1209NMC0164 12116DP0260 | 12-ORA-91-2.62/2.8 | add a second 12-foot wide mixed flow lane to the eastbound (EB) SR-91 diamond entrance ramp from the northbound (NB) SR-39 (Beach Blvd.) the City of Buena Park. See attached page 1A for the detailed description of work. All performed work shall be in accordance | SR-91, Buena park | 12/31/2011 | NOT VERIFIED | Details CEM-3701 Report |