Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15871-15880 of 17992 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993754 | Project ID: 993754 DEA: 033J0804 EFIS: 0322000184 | 03-SAC/SAC-99-2.36/2.36 | Site preparation, remove and replace structural section, reset fence, remove and replace unsound concrete and rebar, remove and replace structure backfill, minor HMA, traffic control, and incidental work. | 07/26/2023 | 1 (04/21/2022) | Details CEM-3701 Report | |
995434 | Project ID: 995434 DEA: 034J9104 EFIS: 0323000288 | 03-ED-50-18/58 | Site preparation, remove dead, dying and hazardous trees and debris, traffic control, and incidental work. | 1 (11/13/2023) | Details CEM-3701 Report | ||
993920 | Project ID: 993920 DEA: 033J0704 EFIS: 0322000180 | 03-ED/ED-49-15.3/15.3 | Site preparation, remove stucture excavation, replace 24" reinforced concrete pipe, backfill, place aggregate base, minor paving, traffic control and incidental work. | 06/27/2022 | 1 (06/27/2022) | Details CEM-3701 Report | |
995365 | Project ID: 995365 DEA: 034J5804 EFIS: 0323000209 | 03-YOL--2.2/2.7 | Site preparation, reset guardrail, debris removal, backfill, HMA Dike, concrete vegetation control, erosion control, traffic control, and incidental work | 1 (11/13/2023) | Details CEM-3701 Report | ||
995325 | Project ID: 995325 DEA: 034J2004 EFIS: 0323000130 | 03-SIE-49-2.5/3.5 | Site preparation, sawcut, excavation, remove existing crib wall, falsework, construct viaduct/structure type selection, backfill, HMA, barrier rail, erosion control, traffic control, and incidental work | 12/06/2023 | 1 (11/13/2023) | Details CEM-3701 Report | |
994134 | Project ID: 994134 DEA: 11431584 EFIS: 1122000215 | 11-VARIOUS/VARIOUS,SD/SD-Various,78-Various/Various, 16.6/16.6 | Site waste removal and clean up at level 1, level 3 encampments | 1 (06/11/2024) | Details CEM-3701 Report | ||
210935 | Project ID: 210935 EFIS: 1014000197 MINOR: 10A1723 | 10--15-11.0 | SJ TURNER RD STAA TRUCK IMPROVEMENT | 12/06/2019 | 2 (02/17/2016) | Details CEM-3701 Report | |
214777 | Project ID: 214777 DEA: 100H5604 EFIS: 1013000148 | 10-SJ-26-13.1/R13.8 | SJ26 WIDENING | SAN JOAQUIN COUNTY NEAR LINDEN FROM 0.5 MILE EAST OF FINE ROAD TO 1.3 MILES WEST OF ESCALON-BELLOTA ROAD | 12/07/2020 | 1 (03/30/2020) | Details CEM-3701 Report |
214466 | Project ID: 214466 DEA: 081F1414 EFIS: 0815000231 | 08-RIV-15-15-54.2/54.3 | Slab & lane replacement with JPCP & precast conc pavement, place HMA. | Riverside and San Diego County | 05/26/2022 | 1 (03/20/2020) | Details CEM-3701 Report |
7160 | Project ID: 7160 DEA: 042E6104 EFIS: 0400021203 | 04-ALA-580-0.9/4.5 | SLAB AND HOT MIX ASPHALT REPLACEMENT. | ALAMEDA COUNTY IN AND NEAR TRACY FROM 0.15 MILE WEST OF MIDWAY ROAD UNDERCROSSING TO 1.5 MILES EAST OF NORTH FLYNN ROAD | 09/12/2012 | 1 (07/02/2012) | Details CEM-3701 Report |