Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15411-15420 of 16958 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994430 | Project ID: 994430 DEA: 061F1304 EFIS: 0623000086 | 06-KER-58-73.9/74.9 | The scope of work is to install, remove, and replace the damaged concrete barrier with a Type 50 barrier with a glared screen. A temporary K-Rail will be installed during construction and traffic control during the night. | 1 (01/09/2023) | Details CEM-3701 Report | ||
993919 | Project ID: 993919 DEA: 071XW704 EFIS: 0722000254 | 07-LA-103-1.59/1.59, 8.29/8.29 | The scope of work will be to repair damages to bridge structures, repair da maged slopes, construct hardscape to deter repeated damage to the State Highway System and to repair other damages to State assets | 08/25/2022 | 1 (08/25/2022) | Details CEM-3701 Report | |
212302 | Project ID: 212302 DEA: 080C70U4 EFIS: 0815000189 COOP: 081646 | 08-SBD-210-PM R 25 | The SR 210 Base Line Interchange project, in the City of Highland, includes widening of the Base Line overcrossing at the SR 210, along with additional ramp widening improvements for the northbound on-ramp, northbound off-ramp and southbound on-ramps. | SR210 Lane Addition work proposes to improve SR 210 within the cities of Highland, Redlands, San Bernardino and unincorporated sections of San Bernardino County, | 2 (01/15/2020) | Details CEM-3701 Report | |
7218 | Project ID: 7218 EFIS: 0000001155 Permit Numbers: 04126DP0070 | 04-SON-12-PM 38.06-PM 38.36 | The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Br | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report | |
1590 | Project ID: 1590 EFIS: 0000001155 Permit Numbers: 0409NUS1283 | 04-SON-12-38.06/38.36 | The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Broadway | Broadway, Sonoma | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report |
7188 | Project ID: 7188 EFIS: 0000001155 Permit Numbers: 0412NRT0193 | 04-SON-12-38.06/38.36 | The street lights on the existing wood utility poles being removed are at the corner of Newcomb St. at 20101 Broadway. The second one is mid block between Newcomb St. and Malet St. at 1055 Broadway. The third one is at the corner of Malet St. at 1001 Broadway | Broadway, Sonoma | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
208855 | Project ID: 208855 Permit Numbers: 0411NMC2101 04136DP0567 0412NRW2027 | 04-SCL-82-16.7/16.7 | The Sunnyvale Ave. / Old San Francisco Road Intersection improvement Project proposes to reconstruct and improve the Sunnyvale Ave/Old San Francisco Road intersection, providing a signalized left turn for southbound Sunnyvale Ave. to eastbound old San Fran | Sunnyvale Ave. / Old San Francisco Rd. Intersection, Sunnyvale | 09/14/2018 | 1 (08/05/2013) | Details CEM-3701 Report |
994344 | Project ID: 994344 DEA: 041W7004 EFIS: 0421000075 COOP: 042902 | 04-ALA-I-580-9.3/ 10.1 | The Vasco Road/I-580 Interchange Improvements to enhance safety, improve operational deficiencies and provide bicycle and pedestrian facilities throughout the interchange | Vasco Road/I-580 Interchange | 2 (05/09/2023) | Details CEM-3701 Report | |
7671 | Project ID: 7671 EFIS: 0000001155 Permit Numbers: 04116MC1727 | 04-SON-101- | The widening of E. Washington west of the Washington & HWY 101 On-Ramp. | The widening of E. Washington west of the Washington & HWY 101 On-Ramp. | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
209110 | Project ID: 209110 Permit Numbers: 0412NMC1476 | 04-SM-82-13.25/13.25 | The work consists of installing an 8" water main within El Camino Real. | El Camino Real, Burlingame | 09/14/2018 | 1 (09/13/2013) | Details CEM-3701 Report |