Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14591-14600 of 17908 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215673Project ID: 215673
DEA: 031J9204
EFIS: 0321000148
03-BUT-70-15.43/15.43, 15.43Butte 70 Girders Repair - Major Damage Restoration 01/18/20221 (05/17/2021)Details CEM-3701 Report
215668Project ID: 215668
DEA: 042W2404
EFIS: 0421000159
04-CC-4-14.549   1 (04/19/2021)Details CEM-3701 Report
215669Project ID: 215669
Permit Numbers: 04206MC2807 0420NRD3000 04216DP0039 04206MC2807 0420NRD3000 04216RW1726 04216RW1987
04-SCL-237-1.59/1.85The 700 Middlefield road improvement include work along Middlefield road aand Maude Ave.Middlefield Road, Mountain View05/01/20231 (04/01/2021)Details CEM-3701 Report
215671Project ID: 215671
DEA: 071XU804
EFIS: 0721000170
07-LA-101-11.6, 11.6, 11.6/11.6  07/14/20231 (06/30/2021)Details CEM-3701 Report
215674Project ID: 215674
Permit Numbers: 0818NMC0281 0821NRT1208 0822NRT0068 08216RT1209 08226RT0070
08---43.637Enter onto Interstate 15 right of way at Second Street in the City of Norco to widen the south side of Second Street between Hamner Avenue and the I-15 southbound onramp by constructing new pavement, curb ramps at the southbound onramp, curb and gutter, cross gutter, sidewalk, and install signal mo2nd Street, Norco 1 (06/23/2021)Details CEM-3701 Report
215675Project ID: 215675
DEA: 022J1604
EFIS: 0221000035
02-SHA-89-29.1/29.4, 29.1 - 29.4Replace Lake Britton bridge rail damaged by collision.Lake Britton Bridge09/27/20211 (04/08/2021)Details CEM-3701 Report
215676Project ID: 215676
DEA: 020J6404
EFIS: 0219000145
02-PLU-36-R13.6/R14.2A13 AT ROUTE 36 SAFETYIN PLUMAS COUNTY NEAR CHESTER FROM 0.2 MILE WEST OF BAILEY CREEK BRIDGE TO 0.3 MILE EAST OF COUNTY ROAD A-13. 1 (07/08/2021)Details CEM-3701 Report
215678Project ID: 215678
Permit Numbers: 0418NMC2215 0420NRT2773 04216DP0668
04-SM-82,280-23.5-23.7/M27.16R,R25.98Construction of approximately 1,050 liner feet of new sidewalk, and curb and gutter, along the west side of El Camino Real from San Pedro road to A Street where there is currently no sidewalk.San Pedro Rd. to A St., San Mateo County & Daly City03/13/20231 (04/14/2021)Details CEM-3701 Report
215679Project ID: 215679
DEA: 010J8604
EFIS: 0119000116
01-DN-101,199-VARFURNISH AND PLACE POLYESTER CONCRETE OVERLAY ON THE BRIDGE DECKS.DEL NORTE COUNTY AT VARIOUS LOCATIONS10/20/20221 (04/28/2021)Details CEM-3701 Report
215680Project ID: 215680
DEA: 010K4804
EFIS: 0120000102
01-LAK-20-0.7/5.2,5.9/8.2RHMA OVERLAY, COLD PLANE AC PAVEMENT AND PRECOATED AGGREGATE.LAKE COUNTY NEAR UPPER LAKE FROM 0.1 MILE WEST OF BLUE LAKES ROAD TO 0.4 MILE WEST OF WITTER SPRINGS ROAD AND FROM 0.1 MILE EAST OF BACHELOR CREEK BRIDGE TO 0. 1 MILE WEST OF ROUTE 2904/26/20221 (04/28/2021)Details CEM-3701 Report