Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14591-14600 of 17908 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215673 | Project ID: 215673 DEA: 031J9204 EFIS: 0321000148 | 03-BUT-70-15.43/15.43, 15.43 | Butte 70 Girders Repair - Major Damage Restoration | 01/18/2022 | 1 (05/17/2021) | Details CEM-3701 Report | |
215668 | Project ID: 215668 DEA: 042W2404 EFIS: 0421000159 | 04-CC-4-14.549 | 1 (04/19/2021) | Details CEM-3701 Report | |||
215669 | Project ID: 215669 Permit Numbers: 04206MC2807 0420NRD3000 04216DP0039 04206MC2807 0420NRD3000 04216RW1726 04216RW1987 | 04-SCL-237-1.59/1.85 | The 700 Middlefield road improvement include work along Middlefield road aand Maude Ave. | Middlefield Road, Mountain View | 05/01/2023 | 1 (04/01/2021) | Details CEM-3701 Report |
215671 | Project ID: 215671 DEA: 071XU804 EFIS: 0721000170 | 07-LA-101-11.6, 11.6, 11.6/11.6 | 07/14/2023 | 1 (06/30/2021) | Details CEM-3701 Report | ||
215674 | Project ID: 215674 Permit Numbers: 0818NMC0281 0821NRT1208 0822NRT0068 08216RT1209 08226RT0070 | 08---43.637 | Enter onto Interstate 15 right of way at Second Street in the City of Norco to widen the south side of Second Street between Hamner Avenue and the I-15 southbound onramp by constructing new pavement, curb ramps at the southbound onramp, curb and gutter, cross gutter, sidewalk, and install signal mo | 2nd Street, Norco | 1 (06/23/2021) | Details CEM-3701 Report | |
215675 | Project ID: 215675 DEA: 022J1604 EFIS: 0221000035 | 02-SHA-89-29.1/29.4, 29.1 - 29.4 | Replace Lake Britton bridge rail damaged by collision. | Lake Britton Bridge | 09/27/2021 | 1 (04/08/2021) | Details CEM-3701 Report |
215676 | Project ID: 215676 DEA: 020J6404 EFIS: 0219000145 | 02-PLU-36-R13.6/R14.2 | A13 AT ROUTE 36 SAFETY | IN PLUMAS COUNTY NEAR CHESTER FROM 0.2 MILE WEST OF BAILEY CREEK BRIDGE TO 0.3 MILE EAST OF COUNTY ROAD A-13. | 1 (07/08/2021) | Details CEM-3701 Report | |
215678 | Project ID: 215678 Permit Numbers: 0418NMC2215 0420NRT2773 04216DP0668 | 04-SM-82,280-23.5-23.7/M27.16R,R25.98 | Construction of approximately 1,050 liner feet of new sidewalk, and curb and gutter, along the west side of El Camino Real from San Pedro road to A Street where there is currently no sidewalk. | San Pedro Rd. to A St., San Mateo County & Daly City | 03/13/2023 | 1 (04/14/2021) | Details CEM-3701 Report |
215679 | Project ID: 215679 DEA: 010J8604 EFIS: 0119000116 | 01-DN-101,199-VAR | FURNISH AND PLACE POLYESTER CONCRETE OVERLAY ON THE BRIDGE DECKS. | DEL NORTE COUNTY AT VARIOUS LOCATIONS | 10/20/2022 | 1 (04/28/2021) | Details CEM-3701 Report |
215680 | Project ID: 215680 DEA: 010K4804 EFIS: 0120000102 | 01-LAK-20-0.7/5.2,5.9/8.2 | RHMA OVERLAY, COLD PLANE AC PAVEMENT AND PRECOATED AGGREGATE. | LAKE COUNTY NEAR UPPER LAKE FROM 0.1 MILE WEST OF BLUE LAKES ROAD TO 0.4 MILE WEST OF WITTER SPRINGS ROAD AND FROM 0.1 MILE EAST OF BACHELOR CREEK BRIDGE TO 0. 1 MILE WEST OF ROUTE 29 | 04/26/2022 | 1 (04/28/2021) | Details CEM-3701 Report |