Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14571-14580 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215666 | Project ID: 215666 DEA: 11430564 EFIS: 1119000015 | 11-SD-67-R6.0/24.4 | COLD PLANE, RHMA OVERLAY AND HFST, AND INSTALL CHANNELIZERS. | SAN DIEGO COUNTY NEAR LAKESIDE AND RAMONA FROM 0.2 MILE NORTH OF SAN DIEGO RIVER BRIDGE TO ROUTE 78 | 11/04/2024 | 1 (07/06/2021) | Details CEM-3701 Report |
215667 | Project ID: 215667 DEA: 120Q3104 EFIS: 1216000124 | 12-ORA-91-1.8/3.4 | INSTALL OH SIGN STRUCTURES AND RECONSTRUCT MEDIAN CONCRETE BARRIER. | ORANGE COUNTY IN BUENA PARK AT VARIOUS LOCATIONS FROM KNOTT AVENUE UNDERCROSSING TO 0.2 MILE WEST OF ROUT 91/5 SEPARATION | 1 (05/11/2021) | Details CEM-3701 Report | |
215673 | Project ID: 215673 DEA: 031J9204 EFIS: 0321000148 | 03-BUT-70-15.43/15.43, 15.43 | Butte 70 Girders Repair - Major Damage Restoration | 01/18/2022 | 1 (05/17/2021) | Details CEM-3701 Report | |
215668 | Project ID: 215668 DEA: 042W2404 EFIS: 0421000159 | 04-CC-4-14.549 | 1 (04/19/2021) | Details CEM-3701 Report | |||
215669 | Project ID: 215669 Permit Numbers: 04206MC2807 0420NRD3000 04216DP0039 04206MC2807 0420NRD3000 04216RW1726 04216RW1987 | 04-SCL-237-1.59/1.85 | The 700 Middlefield road improvement include work along Middlefield road aand Maude Ave. | Middlefield Road, Mountain View | 05/01/2023 | 1 (04/01/2021) | Details CEM-3701 Report |
215671 | Project ID: 215671 DEA: 071XU804 EFIS: 0721000170 | 07-LA-101-11.6, 11.6, 11.6/11.6 | 07/14/2023 | 1 (06/30/2021) | Details CEM-3701 Report | ||
215674 | Project ID: 215674 Permit Numbers: 0818NMC0281 0821NRT1208 0822NRT0068 08216RT1209 08226RT0070 | 08---43.637 | Enter onto Interstate 15 right of way at Second Street in the City of Norco to widen the south side of Second Street between Hamner Avenue and the I-15 southbound onramp by constructing new pavement, curb ramps at the southbound onramp, curb and gutter, cross gutter, sidewalk, and install signal mo | 2nd Street, Norco | 1 (06/23/2021) | Details CEM-3701 Report | |
215675 | Project ID: 215675 DEA: 022J1604 EFIS: 0221000035 | 02-SHA-89-29.1/29.4, 29.1 - 29.4 | Replace Lake Britton bridge rail damaged by collision. | Lake Britton Bridge | 09/27/2021 | 1 (04/08/2021) | Details CEM-3701 Report |
215676 | Project ID: 215676 DEA: 020J6404 EFIS: 0219000145 | 02-PLU-36-R13.6/R14.2 | A13 AT ROUTE 36 SAFETY | IN PLUMAS COUNTY NEAR CHESTER FROM 0.2 MILE WEST OF BAILEY CREEK BRIDGE TO 0.3 MILE EAST OF COUNTY ROAD A-13. | 1 (07/08/2021) | Details CEM-3701 Report | |
215678 | Project ID: 215678 Permit Numbers: 0418NMC2215 0420NRT2773 04216DP0668 | 04-SM-82,280-23.5-23.7/M27.16R,R25.98 | Construction of approximately 1,050 liner feet of new sidewalk, and curb and gutter, along the west side of El Camino Real from San Pedro road to A Street where there is currently no sidewalk. | San Pedro Rd. to A St., San Mateo County & Daly City | 03/13/2023 | 1 (04/14/2021) | Details CEM-3701 Report |