Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14541-14550 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
995502 | Project ID: 995502 DEA: 020K7904 EFIS: 0224000001 | 02--- | NOT VERIFIED | Details CEM-3701 Report | |||
1000219 | Project ID: 1000219 DEA: 101L5704 EFIS: 1020000035 MINOR: 10A2636 | 10--- | 1 (04/02/2024) | Details CEM-3701 Report | |||
995503 | Project ID: 995503 Permit Numbers: 0223NSN0345 | 02-SHA-273-16.91 | Reconstruct CG&S, striping and signal & lighting modifications. To include Ameron arm and pole. | Permit project - Trinity Street Bikeway | 1 (01/03/2024) | Details CEM-3701 Report | |
995504 | Project ID: 995504 DEA: 101R8804 EFIS: 1023000243 | 10-SJ-4-14.15 | Emergency bridge repair for Garwood Bridge (Bridge No. 29-0050) on State Route 4 at postmile 14.15 in San Joaquin County. A fire incident under the bridge has affected the steel members of the structure. The project scope includes clearing of waste, cleaning, heat straightening, replacement, sanding | On State Route 4 at postmile 14.15 in San Joaquin County | NOT VERIFIED | Details CEM-3701 Report | |
995505 | Project ID: 995505 Permit Numbers: 06226SN0463 | 06--SR119- | The work is included as part of the development of the northeast corner of SR 119 and South H Street. The proposed development will be a Love's Truck Stop. As part of the off-site work, the northeast return in the intersection will be modified, which will trigger traffic signal modifications. As | Northeast corner of SR 119 and South H Street. | 1 (11/27/2023) | Details CEM-3701 Report | |
995514 | Project ID: 995514 DEA: 024J8204 EFIS: 0223000077 | 02-MOD-299-14.7/20.0 | SCHAFFER MT CHIP - PLACE ASPHALT RUBBER CHIP SEAL WITH REPLACE AC SURFACING. | MODOC COUNTY NEAR CANBY FROM 0.1 MILE EAST OF COUNTY ROAD 85 TO 1.7 MILES WEST OF ROUTE 139 | 11/27/2024 | 1 (12/29/2023) | Details CEM-3701 Report |
995515 | Project ID: 995515 DEA: 034H8904 EFIS: 0319000072 | 03-ED-50-75.4/80 | MODIFY LIGHTING AND FIBER OPTIC CABLE SYSTEMS. | EL DORADO COUNTY IN SOUTH LAKE TAHOE FROM NORTH JUNCTION ROUTE 89 TO PIONEER TRAIL | 1 (01/17/2024) | Details CEM-3701 Report | |
995506 | Project ID: 995506 EFIS: 1121000254 | 11-SD-- | Install a pedestrian staggered mid-block crosswalk (z-crossing) with pedestrian hybrid beacon to connect pedestrians and bicyclists to the east and west sides of El Camino Real. | NOT VERIFIED | Details CEM-3701 Report | ||
995507 | Project ID: 995507 EFIS: 1118000003 | 11-SD-- | NOT VERIFIED | Details CEM-3701 Report | |||
995508 | Project ID: 995508 DEA: 061F4304 COOP: 061781 Permit Numbers: 0623NSN0151 | 06-FRE-201-0.7/0.91 | City of Kingsburg - install ped crossings with RRFB beacons on poles. | 1 (12/29/2023) | Details CEM-3701 Report |