Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 131-140 of 17277 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
36Project ID: 36
DEA: 01290304
01-HUM-36,101-R0.0/0.5,91.7/95.0CONSTRUCT INTERCHANGE AND FRONTAGE ROADHumboldt county, Hwy 101 Alton Interchange03/11/20111 (12/02/2009)Details CEM-3701 Report
37Project ID: 37
DEA: 01291714
01-MEN-1-37.9/38.2CONSTRUCT TIE BACK RETAINING WALL 04/26/20111 (04/26/2011)Details CEM-3701 Report
38Project ID: 38
DEA: 01292004
01-MEN-20-0.3CONSTRUCT 2 WAY LEFT TURN LANEIN MENDOCINO COUNTY NEAR FORT BRAGG FROM 0.4 KM TO 3.9 KM EAST OF STATE ROUTE 112/16/20091 (12/16/2009)Details CEM-3701 Report
39Project ID: 39
DEA: 01293134
01-DN-101-35.8WIDEN ROADWAY AND BRIDGESIN DEL NORTE COUNTY NORTH OFCRESCENT CITY AT SMITH RIVEROVERFLOW BRIDGE AND AT GILBERTCREEK BRIDGE03/11/20111 (08/06/2007)Details CEM-3701 Report
40Project ID: 40
DEA: 01293144
01-DN-199-17.4/18.0Existing bridge to be replaced.Del Norte County near Gasquet from 0.3 km South Hardscrabble Creek Bridge to 0.2 km North of Hardscrabble Creek Bridge.03/23/20101 (03/23/2010)Details CEM-3701 Report
41Project ID: 41
DEA: 01296104
EFIS: 0100000084
01-HUM-101-089.1/090.4REPLACE BRIDGES (SCOUR)- MAD RIVER BRIDGESMad River, Arcata CA12/05/20141 (04/28/2011)Details CEM-3701 Report
42Project ID: 42
DEA: 01297704
01-MEN-20-53.9/61.0REHABILITATE ROADWAY AND PAVE WITH RUBBERIZED AC 11/09/20101 (03/09/2007)Details CEM-3701 Report
44Project ID: 44
DEA: 01307904
01-MEN-1-R16.4/R18.1  03/11/20111 (06/30/2006)Details CEM-3701 Report
45Project ID: 45
DEA: 01310104
EFIS: 0100000095
01-MEN-1-33.4/33.8WIDEN ROADWAY AND REPLACE BRIDGE WITH CIP/PS CONCRETE BOX GIRDERS.MENDOCINO COUNTY NEAR ELK AT GREENWOOD CREEK BRIDGE04/27/20181 (04/02/2012)Details CEM-3701 Report
46Project ID: 46
DEA: 013116U4
01-MEN-162,253-1.2,0.8,5.5WIDEN BRIDGES,CONSTRUCT RETAINING WALLS AND UPGRADE BRIDGE RAILS 03/11/20111 (03/20/2008)Details CEM-3701 Report