Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 121-130 of 17750 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215141 | Project ID: 215141 DEA: 010G7104 EFIS: 0117000052 MINOR: 01A2003 | 01-HUM-96-0.6 | Willow Creek Charging Station | Willow Creek Maintenance Yard | 08/25/2022 | 1 (08/28/2020) | Details CEM-3701 Report |
7619 | Project ID: 7619 DEA: 041F9504 EFIS: 0412000586 | 04-CC-80-10.6/13.6 | Replace PCC slabs (eastbound | Willow Avenue to Carquinez Bridge, Hercules | 04/19/2021 | 1 (08/02/2012) | Details CEM-3701 Report |
211102 | Project ID: 211102 DEA: 010A4904 | 01-HUM-299-R25.0/R25.9 | WIDEN ROADWAY, CONSTRUCT HMA AND RHMA OVERLAY, DRAINAGE AND MGS | WIDEN ROADWAY, CONSTRUCT HMA AND RHMA OVERLAY, DRAINAGE AND MGS | 06/27/2017 | 1 (09/27/2016) | Details CEM-3701 Report |
210862 | Project ID: 210862 DEA: 031F4004 EFIS: 0300020420 | 03-PLA-80-35.1/38.3 | WIDEN EASTBOUND ROADWAY | WIDEN EASTBOUND ROADWAY | 06/19/2020 | 1 (10/20/2015) | Details CEM-3701 Report |
3688 | Project ID: 3688 EFIS: 0000001155 Permit Numbers: 0709NSN0432 | 07-LA-72-3.65/3.65 | Modify intersection by removing the split phasing for the NB and SB directions. Upgrade signal poles for NB, SB and EB left turn directions. Install front and advance detection for the NB and SB directions. Install pedestrian heads and pushbuttons. Modify | Whittier Blvd, Whittier | 11/08/2012 | NOT VERIFIED | Details CEM-3701 Report |
210491 | Project ID: 210491 Permit Numbers: 12156DP0120 1211NMC0297 1214NRT0731 | 12-ORA-VAR--1/-1 | Perform the work authorized under Caltrans Encroachment Permit No. 1211-NMC-0297 issued to the CITY OF LA HABRA in accordance with all the terms and conditions of the original permit. Permittee shall keep complete copies of both permits on the job site at all times while work is in progress. Thi | Whittier blvd ( SR 72, SR 39), la habra | 12/15/2015 | 1 (05/19/2015) | Details CEM-3701 Report |
209713 | Project ID: 209713 DEA: 032C5904 EFIS: 0300000304 Permit Numbers: 0314AOP0430 0314NRD0542 | 03-PLA-65-10.1/11.2 | Whitney Ranch Parkway Interchange | Whitney Ranch Parkway, Rocklin | 08/30/2018 | 1 (02/25/2014) | Details CEM-3701 Report |
7189 | Project ID: 7189 EFIS: 0000001155 Permit Numbers: 06116CD0384 | 06-FRE-180-43.11/43.62 | Enter upon State Right-of-Way on State Route 180 (SR-180) near Kerman from PM 43.11 to PM 43.62 to set up, maintain and remove temporary traffic control necessary to construct a commercial development for Wal-Mart. Work includes, but not limited to, sawcut | Whitesbridge (Hwy 180), Kerman | 07/30/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
3033 | Project ID: 3033 DEA: 06307004 COOP: 061361 Permit Numbers: 0610NMC0203 0609NMC0132 0611NDP0483 | 06-TUL-63-5.8/8 | Enter upon the State Highway Right-of-way on State Route 63 (SR-63) in Visalia between Post Mile 5.8 and 8.0 to set up, maintain, and remove temporary traffic control necessary to construct the Citys Whitendale Avenue Street Widening Project | Whitendal Avenue at Mooney Blvd., Visalia | 10/13/2010 | NOT VERIFIED | Details CEM-3701 Report |
3379 | Project ID: 3379 EFIS: 0000001155 Permit Numbers: 0610NDP0541 | 06-TUL-63-5.8/8 | Enter upon the State Highway Right-of-way on State Route 63 (SR-63) in Visalia between Post Mile 5.8 and 8.0 to set up, maintain, and remove temporary traffic control necessary to construct the Citys Whitendale Avenue Street Widening Project (Contract No. | Whitendal Avenue at Mooney Blvd., Visalia | 06/11/2018 | 2 (12/05/2014) | Details CEM-3701 Report |